{"operation":"document","citation":"LAC 43:XIII §2141","title":"Remedial Measures: Cast Iron and Ductile Iron Pipelines [49 CFR 192.489]","source_type":"regulation","agency":"Louisiana Office of Conservation","status":"current","official":true,"published_on":null,"effective_on":null,"summary":"A. General Graphitization. Each segment of cast iron or ductile iron pipe on which general graphitization is found to a degree where a fracture or any leakage might result, must be replaced. [49 CFR 192.489(a)] B. Localized Graphitization. Each segment of cast iron or ductile iron pipe on which loca","machine_formats":{"json":"https://regulus.evalyn.ai/document/la-lac-43-xiii-2141.json","markdown":"https://regulus.evalyn.ai/document/la-lac-43-xiii-2141.md"},"app_url":"https://regulus.evalyn.ai/document/la-lac-43-xiii-2141","source_url":"https://www.doa.la.gov/doa/osr/louisiana-administrative-code/","body":"A. General Graphitization. Each segment of cast iron or ductile iron pipe on which general graphitization is found to a degree where a fracture or any leakage might result, must be replaced. [49 CFR 192.489(a)]\n\nB. Localized Graphitization. Each segment of cast iron or ductile iron pipe on which localized graphitization is found to a degree where any leakage might result, must be replaced or repaired, or sealed by internal sealing methods adequate to prevent or arrest any leakage. [49 CFR 192.489(b)]\n\nAUTHORITY NOTE: Promulgated in accordance with R.S. 30:501 et seq.\n\nHISTORICAL NOTE: Promulgated by the Department of Natural Resources, Office of Conservation, LR 9:237 (April 1983), amended LR 10:529 (July 1984), LR 30:1256 (June 2004).","truncated":false,"body_characters":745}