# Test Requirements for Pipelines to Operate at a Hoop Stress Less Than 30 Percent of SMYS and at or above 100 psi (689 kPa) Gauge [49 CFR 192.507]

- **operation:** document
- **citation:** LAC 43:XIII §2307
- **title:** Test Requirements for Pipelines to Operate at a Hoop Stress Less Than 30 Percent of SMYS and at or above 100 psi (689 kPa) Gauge [49 CFR 192.507]
- **source type:** regulation
- **agency:** Louisiana Office of Conservation
- **status:** current
- **official:** true
- **published on:** Not available
- **effective on:** Not available
- **summary:** A. Except for service lines and plastic pipelines, each segment of a pipeline that is to be operated at a hoop stress less than 30 percent of SMYS and at or above 100 psi (689 kPa) gage must be tested in accordance with the following. [49 CFR 192.507] 1. The pipeline operator must use a test procedu
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/la-lac-43-xiii-2307.json
- **markdown:** https://regulus.evalyn.ai/document/la-lac-43-xiii-2307.md
- **app url:** https://regulus.evalyn.ai/document/la-lac-43-xiii-2307
- **source url:** https://www.doa.la.gov/doa/osr/louisiana-administrative-code/
**body:**

A. Except for service lines and plastic pipelines, each segment of a pipeline that is to be operated at a hoop stress less than 30 percent of SMYS and at or above 100 psi (689 kPa) gage must be tested in accordance with the following. [49 CFR 192.507]

1. The pipeline operator must use a test procedure that will ensure discovery of all potentially hazardous leaks in the segment being tested. [49 CFR 192.507(a)]

2. If, during the test, the segment is to be stressed to 20 percent or more of SMYS and natural gas, inert gas, or air is the test medium: [49 CFR 192.507(b)]

a. a leak test must be made at a pressure between 100 psi (689 kPa) gage and the pressure required to produce a hoop stress of 20 percent of SMYS; or [49 CFR 192.507(b)(1)]

b. the line must be walked to check for leaks while the hoop stress is held at approximately 20 percent of SMYS. [49 CFR 192.507(b)(2)]

3. The pressure must be maintained at or above the test pressure for at least one hour. [49 CFR 192.507(c)]

4. For fabricated units and short sections of pipe, for which a post installation test is impractical, a pre-installation hydrostatic pressure test must be conducted in accordance with the requirements of this Section. [49 CFR 192.507(d)]

AUTHORITY NOTE: Promulgated in accordance with R.S. 30:501 et seq.

HISTORICAL NOTE: Promulgated by the Department of Natural Resources, Office of Conservation, LR 9:238 (April 1983), amended LR 10:530 (July 1984), LR 27:1545 (September 2001), LR 30:1257 (June 2004), LR. 47:1145 (August 2021).