{"operation":"document","citation":"LAC 43:XIII §2913","title":"Transmission Lines: Permanent Field Repair of Imperfections and Damages [49 CFR 192.713]","source_type":"regulation","agency":"Louisiana Office of Conservation","status":"current","official":true,"published_on":null,"effective_on":null,"summary":"A. Each imperfection or damage that impairs the serviceability of pipe in a steel transmission line operating at or above 40 percent of SMYS must be: [49 CFR 192.713(a)] 1. removed by cutting out and replacing a cylindrical piece of pipe; or [49 CFR 192.713(a)(1)] 2. repaired by a method that reliab","machine_formats":{"json":"https://regulus.evalyn.ai/document/la-lac-43-xiii-2913.json","markdown":"https://regulus.evalyn.ai/document/la-lac-43-xiii-2913.md"},"app_url":"https://regulus.evalyn.ai/document/la-lac-43-xiii-2913","source_url":"https://www.doa.la.gov/doa/osr/louisiana-administrative-code/","body":"A. Each imperfection or damage that impairs the serviceability of pipe in a steel transmission line operating at or above 40 percent of SMYS must be: [49 CFR 192.713(a)]\n\n1. removed by cutting out and replacing a cylindrical piece of pipe; or [49 CFR 192.713(a)(1)]\n\n2. repaired by a method that reliable engineering tests and analyses show can permanently restore the serviceability of the pipe. [49 CFR 192.713(a)(2)]\n\nB. Operating pressure must be at a safe level during repair operations. [49 CFR 192.713(b)]\n\nAUTHORITY NOTE: Promulgated in accordance with R.S. 30:501 et seq.\n\nHISTORICAL NOTE: Promulgated by the Department of Natural Resources, Office of Conservation, LR 9:245 (April 1983), amended LR 10:537 (July 1984), LR 27:1548 (September 2001), LR 30:1268 (June 2004).","truncated":false,"body_characters":781}