{"operation":"document","citation":"LAC 43:XIII §2925","title":"Test Requirements for Reinstating Service Lines [49 CFR 192.725]","source_type":"regulation","agency":"Louisiana Office of Conservation","status":"current","official":true,"published_on":null,"effective_on":null,"summary":"A. Except as provided in Subsection B of this Section, each disconnected service line must be tested in the same manner as a new service line, before being reinstated. [49 CFR 192.725(a)] B. Each service line temporarily disconnected from the main must be tested from the point of disconnection to th","machine_formats":{"json":"https://regulus.evalyn.ai/document/la-lac-43-xiii-2925.json","markdown":"https://regulus.evalyn.ai/document/la-lac-43-xiii-2925.md"},"app_url":"https://regulus.evalyn.ai/document/la-lac-43-xiii-2925","source_url":"https://www.doa.la.gov/doa/osr/louisiana-administrative-code/","body":"A. Except as provided in Subsection B of this Section, each disconnected service line must be tested in the same manner as a new service line, before being reinstated. [49 CFR 192.725(a)]\n\nB. Each service line temporarily disconnected from the main must be tested from the point of disconnection to the service line valve in the same manner as a new service line, before reconnecting. However, if provisions are made to maintain continuous service, such as by installation of a bypass, any part of the original service line used to maintain continuous service need not be tested. [49 CFR 192.725(b)]\n\nAUTHORITY NOTE: Promulgated in accordance with R.S. 30:501 et seq.\n\nHISTORICAL NOTE: Promulgated by the Department of Natural Resources, Office of Conservation, LR 9:245 (April 1983), amended LR 10:538 (July 1984), LR 30:1269 (June 2004).","truncated":false,"body_characters":839}