# Test Requirements for Reinstating Service Lines [49 CFR 192.725]

- **operation:** document
- **citation:** LAC 43:XIII §2925
- **title:** Test Requirements for Reinstating Service Lines [49 CFR 192.725]
- **source type:** regulation
- **agency:** Louisiana Office of Conservation
- **status:** current
- **official:** true
- **published on:** Not available
- **effective on:** Not available
- **summary:** A. Except as provided in Subsection B of this Section, each disconnected service line must be tested in the same manner as a new service line, before being reinstated. [49 CFR 192.725(a)] B. Each service line temporarily disconnected from the main must be tested from the point of disconnection to th
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/la-lac-43-xiii-2925.json
- **markdown:** https://regulus.evalyn.ai/document/la-lac-43-xiii-2925.md
- **app url:** https://regulus.evalyn.ai/document/la-lac-43-xiii-2925
- **source url:** https://www.doa.la.gov/doa/osr/louisiana-administrative-code/
**body:**

A. Except as provided in Subsection B of this Section, each disconnected service line must be tested in the same manner as a new service line, before being reinstated. [49 CFR 192.725(a)]

B. Each service line temporarily disconnected from the main must be tested from the point of disconnection to the service line valve in the same manner as a new service line, before reconnecting. However, if provisions are made to maintain continuous service, such as by installation of a bypass, any part of the original service line used to maintain continuous service need not be tested. [49 CFR 192.725(b)]

AUTHORITY NOTE: Promulgated in accordance with R.S. 30:501 et seq.

HISTORICAL NOTE: Promulgated by the Department of Natural Resources, Office of Conservation, LR 9:245 (April 1983), amended LR 10:538 (July 1984), LR 30:1269 (June 2004).
- **truncated:** false
- **body characters:** 839