{"operation":"document","citation":"LAC 43:XIII §309","title":"Distribution System: Incident Report [49 CFR 191.9]","source_type":"regulation","agency":"Louisiana Office of Conservation","status":"current","official":true,"published_on":null,"effective_on":null,"summary":"A. Except as provided in Subsection C of this Section, each operator of a distribution pipeline system shall submit Department of Transportation Form RSPA F 7100.1 as soon as practicable but not more than 30 days after detection of an incident required to be reported under §305. [49 CFR 191.9(a)] B.","machine_formats":{"json":"https://regulus.evalyn.ai/document/la-lac-43-xiii-309.json","markdown":"https://regulus.evalyn.ai/document/la-lac-43-xiii-309.md"},"app_url":"https://regulus.evalyn.ai/document/la-lac-43-xiii-309","source_url":"https://www.doa.la.gov/doa/osr/louisiana-administrative-code/","body":"A. Except as provided in Subsection C of this Section, each operator of a distribution pipeline system shall submit Department of Transportation Form RSPA F 7100.1 as soon as practicable but not more than 30 days after detection of an incident required to be reported under §305. [49 CFR 191.9(a)]\n\nB. When additional relevant information is obtained after the report is submitted under Subsection A of this Section, the operator shall make supplementary reports as deemed necessary with a clear reference by date and subject to the original report. [49 CFR 191.9(b)]\n\nC. Master meter operators are not required to submit an incident report as required by this Section. [49 CFR 191.9(c)]\n\nAUTHORITY NOTE: Promulgated in accordance with R.S. 30:501 et seq.\n\nHISTORICAL NOTE: Promulgated by the Department of Natural Resources, Office of Conservation, LR 9:219 (April 1983), amended LR 10:510 (July 1984), LR 11:255 (March 1985), LR 30:1222 (June 2004), LR 38:111 (January 2012).","truncated":false,"body_characters":977}