# Construction Acceptance [49 CFR 193.2303]

- **operation:** document
- **citation:** LAC 43:XIII §7303
- **title:** Construction Acceptance [49 CFR 193.2303]
- **source type:** regulation
- **agency:** Louisiana Office of Conservation
- **status:** current
- **official:** true
- **published on:** Not available
- **effective on:** Not available
- **summary:** A. No person may place in service any component until it passes all applicable inspections and tests prescribed by this subpart and NFPA-59A-2001 (incorporated by reference, see LAC 43:XIII.6713). [49 CFR 193.2303] AUTHORITY NOTE: Promulgated in accordance with R.S. 30:551.C. HISTORICAL NOTE: Promul
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/la-lac-43-xiii-7303.json
- **markdown:** https://regulus.evalyn.ai/document/la-lac-43-xiii-7303.md
- **app url:** https://regulus.evalyn.ai/document/la-lac-43-xiii-7303
- **source url:** https://www.doa.la.gov/doa/osr/louisiana-administrative-code/
**body:**

A. No person may place in service any component until it passes all applicable inspections and tests prescribed by this subpart and NFPA-59A-2001 (incorporated by reference, see LAC 43:XIII.6713). [49 CFR 193.2303]

AUTHORITY NOTE: Promulgated in accordance with R.S. 30:551.C.

HISTORICAL NOTE: Promulgated by the Department of Natural Resources, Office of Conservation, LR 44:1052 (June 2018).
- **truncated:** false
- **body characters:** 395
