{"operation":"document","citation":"LAC 43:XIII §7913","title":"Auxiliary Power Sources [49 CFR 193.2613]","source_type":"regulation","agency":"Louisiana Office of Conservation","status":"current","official":true,"published_on":null,"effective_on":null,"summary":"A. Each auxiliary power source must be tested monthly to check its operational capability and tested annually for capacity. The capacity test must take into account the power needed to start up and simultaneously operate equipment that would have to be served by that power source in an emergency. [4","machine_formats":{"json":"https://regulus.evalyn.ai/document/la-lac-43-xiii-7913.json","markdown":"https://regulus.evalyn.ai/document/la-lac-43-xiii-7913.md"},"app_url":"https://regulus.evalyn.ai/document/la-lac-43-xiii-7913","source_url":"https://www.doa.la.gov/doa/osr/louisiana-administrative-code/","body":"A. Each auxiliary power source must be tested monthly to check its operational capability and tested annually for capacity. The capacity test must take into account the power needed to start up and simultaneously operate equipment that would have to be served by that power source in an emergency. [49 CFR 193.2613]\n\nAUTHORITY NOTE: Promulgated in accordance with R.S. 30:551.C.\n\nHISTORICAL NOTE: Promulgated by the Department of Natural Resources, Office of Conservation, LR 44:1056 (June 2018).","truncated":false,"body_characters":496}