{"operation":"document","citation":"220 CMR 101.12","title":"Directional Drilling","source_type":"regulation","agency":"Massachusetts Department of Public Utilities","status":"current","official":true,"published_on":"2024-10-11","effective_on":"2024-10-11","summary":"Within one year of October 11, 2024, each operator shall ensure that its written construction procedures include specific provisions for directional drilling and other trenchless technology installation methods that minimize the potential damage to gas pipelines and other underground facilities, inc","machine_formats":{"json":"https://regulus.evalyn.ai/document/ma-cmr-220-101-12.json","markdown":"https://regulus.evalyn.ai/document/ma-cmr-220-101-12.md"},"app_url":"https://regulus.evalyn.ai/document/ma-cmr-220-101-12","source_url":"https://www.mass.gov/doc/220-cmr-10100-1/download","body":"Within one year of October 11, 2024, each operator shall ensure that its written construction procedures include specific provisions for directional drilling and other trenchless technology installation methods that minimize the potential damage to gas pipelines and other underground facilities, including electric, communications, water, sewer, and steam.","truncated":false,"body_characters":357}