{"operation":"document","citation":"COMAR 20.57.02.02","title":"Inspection Follow-Up — Specific Information Request","source_type":"regulation","agency":"Maryland Public Service Commission","status":"current","official":true,"published_on":null,"effective_on":null,"summary":"Maryland pipeline-safety provision COMAR 20.57.02.02, Inspection Follow-Up — Specific Information Request.","machine_formats":{"json":"https://regulus.evalyn.ai/document/md-comar-20-57-02-02.json","markdown":"https://regulus.evalyn.ai/document/md-comar-20-57-02-02.md"},"app_url":"https://regulus.evalyn.ai/document/md-comar-20-57-02-02","source_url":"https://regs.maryland.gov/us/md/exec/comar/20.57.02.02","body":"A. After a complaint, report, or inspection, the Division may send a gas company or gas master meter operator a specific information request.\n\nB. A gas company or gas master meter operator shall respond within 5 working days after receipt of a specific information request relating to a possible reportable incident under COMAR 20.55.01.04B(9).\n\nC. Except as provided under §B of this regulation, a gas company or gas master meter operator shall respond within 30 days after receipt of a specific information request.\n\nD. The Commission may waive the requirements of §B or C of this regulation upon written request from a gas company or gas master meter operator demonstrating sufficient cause.","truncated":false,"body_characters":694}