{"operation":"document","citation":"COMAR 20.57.02.06","title":"Review by Chief Engineer","source_type":"regulation","agency":"Maryland Public Service Commission","status":"current","official":true,"published_on":null,"effective_on":null,"summary":"Maryland pipeline-safety provision COMAR 20.57.02.06, Review by Chief Engineer.","machine_formats":{"json":"https://regulus.evalyn.ai/document/md-comar-20-57-02-06.json","markdown":"https://regulus.evalyn.ai/document/md-comar-20-57-02-06.md"},"app_url":"https://regulus.evalyn.ai/document/md-comar-20-57-02-06","source_url":"https://regs.maryland.gov/us/md/exec/comar/20.57.02.06","body":"If a gas company or gas master meter operator objects to the proposed compliance order or civil penalty and submits a written explanation, information, or other materials in response to a NOPV, the chief engineer shall review the submissions and determine whether to negotiate further, modify, or withdraw the NOPV, or file a complaint under Public Utilities Article, §3-102, Annotated Code of Maryland.","truncated":false,"body_characters":403}