# Chapter 420, § 5: Installation and Maintenance Standards

- **operation:** document
- **citation:** 65-407 C.M.R. ch. 420, § 5
- **title:** Chapter 420, § 5: Installation and Maintenance Standards
- **source type:** regulation
- **agency:** Maine Public Utilities Commission
- **status:** current
- **official:** true
- **published on:** 2026-06-30
- **effective on:** 2026-06-30
- **summary:** A. Interruptions of Service
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/me-cmr-65-407-420-5.json
- **markdown:** https://regulus.evalyn.ai/document/me-cmr-65-407-420-5.md
- **app url:** https://regulus.evalyn.ai/document/me-cmr-65-407-420-5
- **source url:** https://www.maine.gov/sos/sites/maine.gov.sos/files/inline-files/407c420-2026-135-AMD.docx
**body:**

A. Interruptions of Service

  1. Operators must use all practicable means to avoid interruptions to
  service, including maintaining appropriate levels of maintenance and
  planning for unexpected events.

  2. Should interruptions occur, operators must reestablish service
  within the shortest time practicable consistent with safety.

  3. Operators must keep a record of all interruptions to service
  involving twenty or more customers that include the following:

  a. The date and time of interruption;

  b. The approximate number of customers affected;

  c. The date and time of service restoration;

  d. The cause of such interruption when known; and

  e. A description of steps taken to prevent its recurrence.

  4. Operators must report to the MPUC unintended service interruptions
  pursuant to Section 5(A)(3) of this Chapter occurring within a
  calendar month by the 15th of the following month.

  5. When an operator interrupts service to perform work on lines or
  equipment, such work must be done at a time causing minimum
  inconvenience to customers consistent with the circumstances.

  6. If practicable, operators must notify, three days in advance of
  scheduled work on lines or equipment that requires an interruption to
  service, all commercial, institutional or other customers that can
  reasonably be expected to be seriously affected.

  B. Operator Qualification (OQ) Program for New Construction

  Operators must include all pertinent tasks related to new construction
  as covered tasks in their OQ Program.

C. Installation and Maintenance of Meters, Pressure Regulators and
Service Piping

  1. Location of Meters. Operators must install meters in either of the
  following locations:

  a. Outside the building at a location selected by the operator; or

  b. When an outside location is not feasible, inside the building,
  preferably in a dry, well-ventilated place not subject to excessive
  heat, and as near as possible to the point of entrance of the pipe
  supplying service to the building.

  2. Master Meters. Operators must not utilize master meter systems
  unless all service lines to the buildings served are operated and
  maintained by an operator in accordance with this Chapter.

  3. Protection of Meters and Distribution System Facilities from Damage
  from Motorized Vehicles or Equipment. Operators must provide adequate
  protective barriers for gas meters, regulators, and aboveground
  pipeline facilities located in areas subject to vehicular damage on
  each side exposed to vehicular traffic. Operators that have
  above-ground piping and appurtenances at commercial and industrial
  premises must consider the potential for damage to the gas facilities
  from equipment used in the operation and maintenance of that facility
  and provide adequate protection.

  4. Protection of Meters and Distribution System Facilities from Snow
  and Ice Damage. Operators must protect regulators, meters, and other
  equipment installed in the piping system must from the forces
  anticipated as a result of accumulated snow or falling snow and/or
  ice.

  5. Accessibility and Location of Pressure Regulators at Meters or
  Service Piping. Pressure regulators installed by operators at meters
  or on service piping locations must conform to the following
  requirements:

  a. Pressure regulators must be accessible for inspection, testing and
  adjustment.

  b. Pressure regulators must be installed with a screened vent pointed
  down, or under a protective cover that will prevent blockage of the
  screened vent by rain, snow, ice or debris.

  c. Vents on pressure regulator~~s~~ installed after July 1, 2011 with
  over-pressure protection that vent gas to atmosphere must be at least
  three feet horizontally, or eight feet vertically, away from any
  existing building opening above the vent, and at least five feet away
  from any existing source of ignition (e.g., electrical meters,
  openings into direct-vent (sealed combustion system) appliances, or
  mechanical ventilation air intakes). Pressure regulators that utilize
  over-pressure shutoff (OPSO) technology or otherwise effectively
  eliminate venting gas to atmosphere need not abide by the above
  distance restrictions.

  d. Operators must not direct-bury new regulators. All existing buried
  regulators must be rated by their manufacturer for the application for
  which they are used and must be vented above grade.

  6. Observation of Unsafe Condition of Customer Facilities

  a. When visiting a customer's premises for any technical service, such
  as atmospheric corrosion inspections of facilities or connecting or
  reconnecting a customer service, operators must also observe visible
  customer piping for atmospheric corrosion or other potential safety
  issues.

  b. All operators must include in their O&M Procedures a "Red Tag"
  hazardous equipment procedure for suspending service to a customer
  when a hazardous condition is discovered that makes the continued
  delivery of gas unsafe.

  c. Operators' Public Awareness Plans must include notification to
  customers that their piping must be in compliance with NFPA 54 and
  maintained to prevent atmospheric corrosion.

  D. Installation and Maintenance of Mains and Service Lines

  1. Installation of Plastic Pipe, Warning Tape, and Tracer Wire. To
  facilitate location of buried plastic pipe, when plastic pipe is
  installed or replaced, operators must use the following location
  methods:

  a. An electrically conductive tracer wire must be installed with new
  or replaced plastic pipe, including plastic pipe that is inserted into
  existing buried cast iron pipe as a means of pipe replacement. Tracer
  wire must not be wrapped around the pipe and contact with the pipe
  must be minimized but is not prohibited when trenchless technology,
  including pipe insertion, is used. Tracer wire or other metallic
  elements installed for pipe locating purposes must be resistant to
  corrosion damage, either by use of coated 12-gauge copper wire or by
  other means.

  b. Continuous gas pipeline warning tape must be installed
  approximately one foot below finish grade. The warning tape must be
  yellow, indicate the presence of a gas line, and at least six inches
  wide. No warning tape is required when pipe is installed by trenchless
  technology, including pipe insertion.

  2. Plastic Pipe Joining and Design

  a. Each person that joins plastic pipe must be qualified to do so for
  each joining method at intervals not exceeding 15 months, but at least
  once each calendar year.

  b. Each completed joint, regardless of joint type, must be inspected
  by a person qualified to perform the inspection, and the joint, pipe,
  or fitting must be marked with the initials or other identifier unique
  to the individuals who both made and inspected the joint. This person
  cannot be the person that performed the joining method that is subject
  to inspection.

  c. Design of plastic pipe must be in accordance with the design factor
  specified in 49 C.F.R. §192.121.

  3. Minimum Cover and Separation Standards for Mains and Service Lines

  a. Mains in Public Right-of-Ways. New or replaced mains located in
  public rights-of-way must be installed with at least 24 inches of
  cover above the shallowest pipe appurtenance, except where an
  obstruction, from other utilities or underground structures, prevents
  that installation depth or when pipe is inserted into existing pipe.
  This provision does not supersede any minimum cover depth requirements
  of an authority having permitting jurisdiction over the facilities
  being installed.

  b. Service Lines. Service lines must be installed with at least 24
  inches of cover above the shallowest appurtenance attached to the
  service line. Cover may be reduced to 18 inches above the shallowest
  appurtenance attached to the service line for the connection to a
  prefabricated riser.

  c. Separation from Underground Obstructions

  1. Where there is interference with underground obstructions, the
  operator must lay the main or service at a clearance distance of not
  less than 12 inches away from such obstructions unless the operator
  provides adequate shielding to protect the gas pipeline and the other
  facilities.

  2. Operators must avoid where possible any interfering structure which
  provides a space in which an explosive atmosphere might accumulate in
  the event of a leak and must give preference to crossing over rather
  than under such structures.

  d. Shallow Installations due to Underground Obstructions. When an
  operator has installed a main or service with less than 24 inches of
  cover, the operator must protect the main or service with shielding
  that conforms with gas industry standards both in respect to material
  and manner of installation. This provision does not supersede any
  minimum cover depth requirements of an authority having permitting
  jurisdiction over the facilities being installed.

  4. Material Tracking

a.  Operators must utilize a Geospatial Information System (GIS), or
    other comparable method to accurately track the location, by GPS
    coordinates, of all materials utilized for the installation and
    maintenance of mains and service lines that are permanently affixed
    to or installed with the mains or service lines.

b.  The materials to be tracked by the operator include but are not
    limited to: pipe, valves, fittings, steel pipeline girth welds, and
    any other appurtenances.

c.  The information tracked by the operator must include but is not
    limited to: material description; manufacturer; date of manufacture;
    batch, lot, and/or heat numbers; maximum design pressure and/or
    minimum yield strength; and identification of the individual(s) who
    made any plastic pipe joints and/or steel welds.

  E. Accessibility and Operability of Pipeline System Valves

  1. Pipeline Valves

  Each pipeline valve installed on a main must be in an accessible
  location and the operator must mark and maintain the pipeline valve's
  GPS coordinates and triangulation on a pipeline system drawing.
  Operators must ensure that current maps are easily accessible to
  operating personnel.

  2. Distribution Line Valves

  a. Operators must maintain each valve installed on a main that has
  been designated by the operator as a critical valve to be readily
  accessible to facilitate its operation.

  b. Each valve installed on a main that has been designated by the
  operator as a critical valve must be inspected and partially operated
  at least once each calendar year at intervals not to exceed 15 months.
  Operators must take prompt remedial action to correct any critical
  valve found inoperable, unless the operator designates an alternative
  critical valve.

  c. Operators must inspect and partially operate each valve installed
  on a main that is not a critical valve at least once every five
  calendar years at intervals not to exceed 66 months. Operators must
  take remedial action to correct any non-critical valve found
  inoperable, or document on valve records and maps that the valve is
  inoperable.

  d. Operators must inspect and partially operate each valve installed
  on a service line where there is not a valve at the service riser or
  where it is not practical to access the service riser valve in an
  emergency at least once every five calendar years at intervals not to
  exceed 66 months.

  e. Operators may designate any valve that the operator does not intend
  to utilize (e.g., a valve installed on a main to facilitate
  construction) as a "non-operational valve." In so designating, the
  operator must document the valve as a non-operational valve on valve
  records and maps. Non-operational valves so designated and documented
  by an operator are not subject to the inspection, operation, or
  remediation requirements of this Section.

  f. Operators that do not have an MPUC-approved isolation zone plan
  must install sufficient distribution valves on mains to isolate looped
  portions of a pipeline system and minimize outages to no more than 500
  customers but no more than the number that the operator has sufficient
  technical resources, including mutual aid, to relight within eight
  hours. The relight interval begins immediately upon restoration of
  sufficient system function to support reconnection of service load.

  e. If an operator installs a valve in a buried box or enclosure, the
  operator must install the box or enclosure to avoid transmitting
  external loads to the main and service line(s).

  3. Valve Boxes. Operators must maintain all valve boxes associated
  with critical valves so as to avoid being paved over or filled with
  debris that prevents access to the valve or degrades valve
  operability.

  4. Valves at Regulator Stations

  a. Each regulator station controlling flow or pressure of gas in a
  distribution system must have a valve installed on the inlet piping at
  a distance from the regulator station sufficient to permit operation
  of the valve during an emergency that might preclude access to the
  station.

  b. All regulator stations constructed after July 1, 2011, must have
  exterior shutoff valves or a sectionalizing valve installed on all
  lines entering and leaving regulator stations for use in an emergency
  to stop gas flow. Such valves must be installed at a readily
  accessible location where they can be operated in an emergency.

  c. Exterior shutoff valves, for stations installed after July 1, 2011,
  must be located a minimum of 40 feet from the regulator station if
  inlet pressure to the station is 100 psig or less. Valves must be
  located a minimum of 100 feet from the regulator station if inlet
  pressure is more than 100 psig. The above minimum separation distances
  do not apply to stations where achieving the minimum separation
  distances is not practicable and where an automated fire-valve is
  installed at the inlet to the station.

  d. A check valve may be used in lieu of an exterior shutoff valve on
  downstream piping if located a minimum of 40 feet from the regulator
  station.

  e. The exterior shutoff valve may be a sectionalizing valve.