# Leakage surveys

- **operation:** document
- **citation:** Mich. Admin. Code R 460.20426
- **title:** Leakage surveys
- **source type:** regulation
- **agency:** Michigan Public Service Commission
- **status:** current
- **official:** true
- **published on:** Not available
- **effective on:** 2026-05-04
- **summary:** Rule 426. In addition to the requirements set forth in 49 C.F.R.§192.706, which is adopted by reference in R 460.20606, an operator of pipeline facilities used in the transportation of sour gas shall conduct leak surveys of those pipeline facilities using leak detection equipment at intervals of not
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/mi-admin-code-r-460-20426.json
- **markdown:** https://regulus.evalyn.ai/document/mi-admin-code-r-460-20426.md
- **app url:** https://regulus.evalyn.ai/document/mi-admin-code-r-460-20426
- **source url:** https://ars.apps.lara.state.mi.us/AdminCode/DownloadAdminCodeFile?FileName=R%20460.20101%20to%20R%20460.20606.pdf
**body:**

Rule 426. In addition to the requirements set forth in 49 C.F.R.§192.706, which is adopted by reference in R 460.20606, an operator of pipeline facilities used in the transportation of sour gas shall conduct leak surveys of those pipeline facilities using leak detection equipment at intervals of not more than 7 1/2 months, but not less than 2 times each calendar year, for all areas falling within the class 1 and class 2 location designations set forth in 49 C.F.R. §192.5, which is adopted by reference in R 460.20606.

History: 2003 AACS.
- **truncated:** false
- **body characters:** 543
