{"operation":"document","citation":"Minn. R. 7852.0900","title":"APPLICATION ACCEPTANCE NOTICE.","source_type":"regulation","agency":"Minnesota Public Utilities Commission","status":"current","official":true,"published_on":"2007-08-21","effective_on":null,"summary":"Within 20 days of commission acceptance of an application for a pipeline routing permit under part 7852.2000, subpart 4, the commission shall provide published notice of acceptance of the application in a newspaper in each county in which a route is proposed by the applicant. The notice must include","machine_formats":{"json":"https://regulus.evalyn.ai/document/minn-r-7852-0900.json","markdown":"https://regulus.evalyn.ai/document/minn-r-7852-0900.md"},"app_url":"https://regulus.evalyn.ai/document/minn-r-7852-0900","source_url":"https://www.revisor.mn.gov/rules/7852.0900","body":"Within 20 days of commission acceptance of an application for a pipeline routing permit under part 7852.2000, subpart 4, the commission shall provide published notice of acceptance of the application in a newspaper in each county in which a route is proposed by the applicant. The notice must include:\n\nA. identification of the applicant;\n\nB. the date of the commission's acceptance of the application;\n\nC. a brief description of the proposed facility including but not limited to size and type;\n\nD. a map showing the routes proposed in that county;\n\nE. the name and function of the public adviser and the address and telephone number where that person can be reached;\n\nF. locations where the pipeline routing permit application is available to the public;\n\nG. procedures for proposing alternate routes; and\n\nH. notice of public information meetings.","truncated":false,"body_characters":850}