# APPLICATION ACCEPTANCE NOTICE.

- **operation:** document
- **citation:** Minn. R. 7852.0900
- **title:** APPLICATION ACCEPTANCE NOTICE.
- **source type:** regulation
- **agency:** Minnesota Public Utilities Commission
- **status:** current
- **official:** true
- **published on:** 2007-08-21
- **effective on:** Not available
- **summary:** Within 20 days of commission acceptance of an application for a pipeline routing permit under part 7852.2000, subpart 4, the commission shall provide published notice of acceptance of the application in a newspaper in each county in which a route is proposed by the applicant. The notice must include
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/minn-r-7852-0900.json
- **markdown:** https://regulus.evalyn.ai/document/minn-r-7852-0900.md
- **app url:** https://regulus.evalyn.ai/document/minn-r-7852-0900
- **source url:** https://www.revisor.mn.gov/rules/7852.0900
**body:**

Within 20 days of commission acceptance of an application for a pipeline routing permit under part 7852.2000, subpart 4, the commission shall provide published notice of acceptance of the application in a newspaper in each county in which a route is proposed by the applicant. The notice must include:

A. identification of the applicant;

B. the date of the commission's acceptance of the application;

C. a brief description of the proposed facility including but not limited to size and type;

D. a map showing the routes proposed in that county;

E. the name and function of the public adviser and the address and telephone number where that person can be reached;

F. locations where the pipeline routing permit application is available to the public;

G. procedures for proposing alternate routes; and

H. notice of public information meetings.
- **truncated:** false
- **body characters:** 850
