# ALTERNATIVE ROUTE ANALYSIS.

- **operation:** document
- **citation:** Minn. R. 7852.1500
- **title:** ALTERNATIVE ROUTE ANALYSIS.
- **source type:** regulation
- **agency:** Minnesota Public Utilities Commission
- **status:** current
- **official:** true
- **published on:** 2007-08-21
- **effective on:** Not available
- **summary:** A comparative environmental analysis of all of the pipeline routes accepted for consideration at public hearings shall be prepared by the commission staff or by the applicant and reviewed by the commission staff. This comparative environmental analysis must be submitted as prefiled testimony as requ
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/minn-r-7852-1500.json
- **markdown:** https://regulus.evalyn.ai/document/minn-r-7852-1500.md
- **app url:** https://regulus.evalyn.ai/document/minn-r-7852-1500
- **source url:** https://www.revisor.mn.gov/rules/7852.1500
**body:**

A comparative environmental analysis of all of the pipeline routes accepted for consideration at public hearings shall be prepared by the commission staff or by the applicant and reviewed by the commission staff. This comparative environmental analysis must be submitted as prefiled testimony as required by part 1405.1900.
- **truncated:** false
- **body characters:** 323