{"operation":"document","citation":"Minn. R. 7852.2300","title":"LAND REQUIREMENTS.","source_type":"regulation","agency":"Minnesota Public Utilities Commission","status":"current","official":true,"published_on":"2007-08-21","effective_on":null,"summary":"For the proposed pipeline, the applicant shall provide the following information:\n\nA. permanent right-of-way length, average width, and estimated acreage;\n\nB. temporary right-of-way (workspace) length, estimated width, and estimated acreage;\n\nC. estimated range of minimum trench or ditch dimensions ","machine_formats":{"json":"https://regulus.evalyn.ai/document/minn-r-7852-2300.json","markdown":"https://regulus.evalyn.ai/document/minn-r-7852-2300.md"},"app_url":"https://regulus.evalyn.ai/document/minn-r-7852-2300","source_url":"https://www.revisor.mn.gov/rules/7852.2300","body":"For the proposed pipeline, the applicant shall provide the following information:\n\nA. permanent right-of-way length, average width, and estimated acreage;\n\nB. temporary right-of-way (workspace) length, estimated width, and estimated acreage;\n\nC. estimated range of minimum trench or ditch dimensions including bottom width, top width, depth, and cubic yards of dirt excavated;\n\nD. minimum depth of cover for state and federal requirements; and\n\nE. rights-of-way sharing or paralleling: type of facility in the right-of-way, and the estimated length, width, and acreage of the right-of-way.","truncated":false,"body_characters":589}