# LAND REQUIREMENTS.

- **operation:** document
- **citation:** Minn. R. 7852.2300
- **title:** LAND REQUIREMENTS.
- **source type:** regulation
- **agency:** Minnesota Public Utilities Commission
- **status:** current
- **official:** true
- **published on:** 2007-08-21
- **effective on:** Not available
- **summary:** For the proposed pipeline, the applicant shall provide the following information:

A. permanent right-of-way length, average width, and estimated acreage;

B. temporary right-of-way (workspace) length, estimated width, and estimated acreage;

C. estimated range of minimum trench or ditch dimensions 
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/minn-r-7852-2300.json
- **markdown:** https://regulus.evalyn.ai/document/minn-r-7852-2300.md
- **app url:** https://regulus.evalyn.ai/document/minn-r-7852-2300
- **source url:** https://www.revisor.mn.gov/rules/7852.2300
**body:**

For the proposed pipeline, the applicant shall provide the following information:

A. permanent right-of-way length, average width, and estimated acreage;

B. temporary right-of-way (workspace) length, estimated width, and estimated acreage;

C. estimated range of minimum trench or ditch dimensions including bottom width, top width, depth, and cubic yards of dirt excavated;

D. minimum depth of cover for state and federal requirements; and

E. rights-of-way sharing or paralleling: type of facility in the right-of-way, and the estimated length, width, and acreage of the right-of-way.
- **truncated:** false
- **body characters:** 589
