{"operation":"document","citation":"Minn. R. 7852.2700","title":"ENVIRONMENTAL IMPACT OF PREFERRED ROUTE.","source_type":"regulation","agency":"Minnesota Public Utilities Commission","status":"current","official":true,"published_on":"2007-08-21","effective_on":null,"summary":"The applicant must also submit to the commission along with the application an analysis of the potential human and environmental impacts that may be expected from pipeline right-of-way preparation and construction practices and operation and maintenance procedures. These impacts include but are not ","machine_formats":{"json":"https://regulus.evalyn.ai/document/minn-r-7852-2700.json","markdown":"https://regulus.evalyn.ai/document/minn-r-7852-2700.md"},"app_url":"https://regulus.evalyn.ai/document/minn-r-7852-2700","source_url":"https://www.revisor.mn.gov/rules/7852.2700","body":"The applicant must also submit to the commission along with the application an analysis of the potential human and environmental impacts that may be expected from pipeline right-of-way preparation and construction practices and operation and maintenance procedures. These impacts include but are not limited to the impacts for which criteria are specified in part 7852.0700 or 7852.1900.","truncated":false,"body_characters":387}