{"operation":"document","citation":"Minn. R. 7852.2800","title":"RIGHT-OF-WAY PROTECTION AND RESTORATION MEASURES.","source_type":"regulation","agency":"Minnesota Public Utilities Commission","status":"current","official":true,"published_on":"2007-08-21","effective_on":null,"summary":"Subpart 1. Protection. The applicant must describe what measures will be taken to protect the right-of-way or mitigate the adverse impacts of right-of-way preparation, pipeline construction, and operation and maintenance on the human and natural environment.\n\nSubp. 2. Restoration. The applicant must","machine_formats":{"json":"https://regulus.evalyn.ai/document/minn-r-7852-2800.json","markdown":"https://regulus.evalyn.ai/document/minn-r-7852-2800.md"},"app_url":"https://regulus.evalyn.ai/document/minn-r-7852-2800","source_url":"https://www.revisor.mn.gov/rules/7852.2800","body":"Subpart 1. Protection. The applicant must describe what measures will be taken to protect the right-of-way or mitigate the adverse impacts of right-of-way preparation, pipeline construction, and operation and maintenance on the human and natural environment.\n\nSubp. 2. Restoration. The applicant must describe what measures will be taken to restore the right-of-way and other areas adversely affected by construction of the pipeline.","truncated":false,"body_characters":433}