# RIGHT-OF-WAY PROTECTION AND RESTORATION MEASURES.

- **operation:** document
- **citation:** Minn. R. 7852.2800
- **title:** RIGHT-OF-WAY PROTECTION AND RESTORATION MEASURES.
- **source type:** regulation
- **agency:** Minnesota Public Utilities Commission
- **status:** current
- **official:** true
- **published on:** 2007-08-21
- **effective on:** Not available
- **summary:** Subpart 1. Protection. The applicant must describe what measures will be taken to protect the right-of-way or mitigate the adverse impacts of right-of-way preparation, pipeline construction, and operation and maintenance on the human and natural environment.

Subp. 2. Restoration. The applicant must
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/minn-r-7852-2800.json
- **markdown:** https://regulus.evalyn.ai/document/minn-r-7852-2800.md
- **app url:** https://regulus.evalyn.ai/document/minn-r-7852-2800
- **source url:** https://www.revisor.mn.gov/rules/7852.2800
**body:**

Subpart 1. Protection. The applicant must describe what measures will be taken to protect the right-of-way or mitigate the adverse impacts of right-of-way preparation, pipeline construction, and operation and maintenance on the human and natural environment.

Subp. 2. Restoration. The applicant must describe what measures will be taken to restore the right-of-way and other areas adversely affected by construction of the pipeline.
- **truncated:** false
- **body characters:** 433
