{"operation":"document","citation":"155 NAC 1-005","title":"155 NAC 1-005 . Each report required by Title 49 of the Code of Federal Regulations, Part 191 adopted herein shall be submitted in duplicate to the Nebraska State Fire Marshal Pipeline Safety Division.","source_type":"regulation","agency":"Nebraska State Fire Marshal","status":"current","official":true,"published_on":null,"effective_on":"2019-08-13","summary":". Each report required by Title 49 of the Code of Federal Regulations, Part 191 adopted herein shall be submitted in duplicate to the Nebraska State Fire Marshal Pipeline Safety Division.. 005. Each report required by Title 49 of the Code of Federal Regulations, Part 191 adopted herein shall be submitted in duplicate to the Nebraska State Fire Marshal Pipeline Safety Division.\n\n005.01. One copy of the annual report submitted pursuant to 005 above will be transmitted to the Pipeline and Hazardous Materials Safety Administration and to the Nebra","machine_formats":{"json":"https://regulus.evalyn.ai/document/ne-155-nac-1-005.json","markdown":"https://regulus.evalyn.ai/document/ne-155-nac-1-005.md"},"app_url":"https://regulus.evalyn.ai/document/ne-155-nac-1-005","source_url":"https://rules.nebraska.gov/api/chapter/GetByTitleId/92","body":"005. Each report required by Title 49 of the Code of Federal Regulations, Part 191 adopted herein shall be submitted in duplicate to the Nebraska State Fire Marshal Pipeline Safety Division.\n\n005.01. One copy of the annual report submitted pursuant to 005 above will be transmitted to the Pipeline and Hazardous Materials Safety Administration and to the Nebraska State Fire Marshal no later than March 15, for data from the preceding calendar year.","truncated":false,"body_characters":449}