{"operation":"document","citation":"N.J.A.C. 14:7-1.25","title":"Directional drilling operations","source_type":"regulation","agency":"New Jersey Board of Public Utilities","status":"current","official":true,"published_on":"2023-06-05","effective_on":"2023-05-03","summary":"N.J.A.C. 14:7-1.25 sets forth requirements for horizontal directional drilling (HDD) operations, including operator development of HDD guidelines, plan and profile drawings, test holes, and procedures for crossing other underground facilities.","machine_formats":{"json":"https://regulus.evalyn.ai/document/nj-njac-14-7-1-25.json","markdown":"https://regulus.evalyn.ai/document/nj-njac-14-7-1-25.md"},"app_url":"https://regulus.evalyn.ai/document/nj-njac-14-7-1-25","source_url":"https://www.nj.gov/bpu/pdf/rules/R.2023%20d.071%20%2855%20N.J.R.%201201%28a%29%29.pdf","body":"N.J.A.C. 14:7-1.25 sets forth requirements for horizontal directional drilling (HDD) operations, including operator development of HDD guidelines, plan and profile drawings, test holes, and procedures for crossing other underground facilities.","truncated":false,"body_characters":243}