# Rupture of Piney Point Oil Pipeline and Release of Fuel Oil

- **operation:** document
- **citation:** DCA00MP006
- **title:** Rupture of Piney Point Oil Pipeline and Release of Fuel Oil
- **source type:** incident
- **agency:** National Transportation Safety Board
- **status:** current
- **official:** true
- **published on:** 2026-01-30
- **effective on:** 2000-04-07
- **summary:** Accident. in Chalk Point, MD, USA. on 2000-04-07. Potomac Electric Power Company. Rupture
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/ntsb-case-dca00mp006.json
- **markdown:** https://regulus.evalyn.ai/document/ntsb-case-dca00mp006.md
- **app url:** https://regulus.evalyn.ai/document/ntsb-case-dca00mp006
- **source url:** https://www.ntsb.gov/investigations/Pages/DCA00MP006.aspx
**body:**

NTSB investigation DCA00MP006.

Event Type: Accident

Event Date: 2000-04-07

Event City: Chalk Point

Event State Or Region: MD

Event Country: USA

Pipeline Operator: Potomac Electric Power Company

Pipeline Type: Hazardous Liquid - Regulated

Accident Type: Rupture

Completion Status: Completed

Report Number: PAR-02-01

Probable cause: The National Transportation Safety Board determines that the probable cause of the April 7, 2000, Piney Point Oil Pipeline accident at the Potomac Electric Power Company?s Chalk Point, Maryland, generating station was a fracture in a buckle in the pipe that was undiscovered because the data from an in-line inspection tool were interpreted inaccurately as representing a T-piece. Contributing to the magnitude of the fuel oil release were inadequate operating procedures and practices for monitoring the flow of fuel oil through the pipeline to ensure timely leak detection.

Tier1Name: System operating

Tier2Name: Product leak/release

Tier1Name: System operating

Tier2Name: Pipe structural malfunction/failure

Finding Tier1Name: Organizational

Finding Tier2Name: Support/oversight/monitoring

Finding Tier3Name: Oversight

Finding Modifier Name: Federal agency

Finding Report Text: Organizational - Support/oversight/monitoring - Oversight - Federal agency

Finding Tier1Name: Organizational

Finding Tier2Name: Development

Finding Tier3Name: Selection/testing

Finding Modifier Name: Inspection organization

Finding Report Text: Organizational - Development - Selection/testing - Inspection organization

Finding Tier1Name: Pipeline

Finding Tier2Name: Pipline systems/equipment

Finding Tier3Name: (general)

Finding Modifier Name: Inadequate inspection

Finding Report Text: Pipeline - Pipline systems/equipment - (general) - Inadequate inspection

Finding Tier1Name: Pipeline

Finding Tier2Name: Pipeline structure

Finding Tier3Name: Pipe

Finding Modifier Name: Failure

Finding Report Text: Pipeline - Pipeline structure - Pipe - Failure

Official NTSB investigation data. NTSB findings determine probable cause and make safety recommendations; they do not adjudicate civil liability or regulatory violations.

What Happened
On the morning of April 7, 2000, the Piney Point Oil Pipeline system, which was owned by the Potomac Electric Power Company, experienced a pipe failure at the Chalk Point Generating Station in southeastern Prince Georgeís County, Maryland. The release was not discovered and addressed by the contract operating company, Support Terminal Services, Inc., until the late afternoon. Approximately 140,400 gallons of fuel oil were released into the surrounding wetlands and Swanson Creek and, subsequently, the Patuxent River as a result of the accident. No injuries were caused by the accident, which cost approximately $71 million for environmental response and clean-up operations.

What We Found
We determined that the probable cause of the April 7, 2000, Piney Point Oil Pipeline accident at the Potomac Electric Power Companyís Chalk Point, Maryland, generating station was a fracture in a buckle in the pipe that was undiscovered because the data from an in-line inspection tool were interpreted inaccurately as representing a T-piece.
Contributing to the magnitude of the fuel oil release were inadequate operating procedures and practices for monitoring the flow of fuel oil through the pipeline to ensure timely leak detection.
This report discusses the following major safety issues:

The sufficiency of the evaluation procedures for pipe wrinkles;
The efficiency of the leak notification procedures; and,
The effectiveness of the incident command.

In addition to these issues, our investigation addressed the leak detection procedures used on the Piney Point Oil Pipeline and the analysis of the pipeline in-line inspection results.

What We Recommended
As a result of this investigation, we made the following new safety recommendations.
To the Research and Special Programs Administration:

Establish quantitative criteria, based on engineering evaluations, for determining whether a wrinkle may be allowed to remain in a pipeline. (P02-01)
Require pipeline owners and operators to provide follow-up telephone updates to the National Response Center when they discover that the information they initially reported contains significant errors or when they identify significant new information directly related to the reporting criteria. (P-02-02)
To the Environmental Protection Agency: Require all your regions to integrate the principles contained in the National Response Team's Technical Assistance Document Incident Command System/Unified CommandóManaging Responses to Oil Discharges and Hazardous Substance Releases under the National Contingency Plan in their area contingency plans and require the regions to train all personnel who are assigned responsibility to implement the plans according to those principles. (P-02-03)

PAR-02-01
<<<PAGE 1>>>

NTSB/PAR-02/01
PB2002-916501
Pipeline Accident Report
Rupture of Piney Point Oil Pipeline
and Release of Fuel Oil
Near Chalk Point, Maryland
April 7, 2000
T
R
A
N
F
A
S
E
N
A
T
I
O
N
A
L
P
L
U
R
I
B
U
S
U
N
U
M
E
T
Y
B
O
R
T
A
T
I
O
N
D
P
R
S
A
O
National
Transportation
Safety Board
Washington, D.C.

<<<PAGE 2>>>

this page intentionally left blank

<<<PAGE 3>>>

Pipeline Accident Report
Rupture of Piney Point Oil Pipeline
and Release of Fuel Oil
Near Chalk Point, Maryland
April 7, 2000
NTSB/PAR-02/01
PB2002-916501 National Transportation Safety Board
Notation 7285A 490 LíEnfant Plaza, S.W.
Adopted July 23, 2002 Washington, D.C. 20594

<<<PAGE 4>>>

National Transportation Safety Board. 2002. Rupture of Piney Point Oil Pipeline and Release of Fuel
Oil Near Chalk Point, Maryland, April 7, 2000. Pipeline Accident Report NTSB/PAR-02/01.
Washington, DC.
Abstract: On the morning of April 7, 2000, the Piney Point Oil Pipeline system, which was owned by the
Potomac Electric Power Company, experienced a pipe failure at the Chalk Point Generating Station in
southeastern Prince Georgeís County, Maryland. The release was not discovered and addressed by the
contract operating company, Support Terminal Services, Inc., until the late afternoon. Approximately
140,400 gallons of fuel oil were released into the surrounding wetlands and Swanson Creek and,
subsequently, the Patuxent River as a result of the accident. No injuries were caused by the accident, which
cost approximately $71 million for environmental response and clean-up operations.
The safety issues discussed in this report are the sufficiency of the evaluation procedures for pipe wrinkles;
the efficiency of the leak notification procedures; and the effectiveness of the incident command.
As a result of its investigation, the National Transportation Safety Board issued safety recommendations to
the Research and Special Programs Administration and the Environmental Protection Agency.
The National Transportation Safety Board is an independent Federal agency dedicated to promoting aviation, railroad, highway, marine,
pipeline, and hazardous materials safety. Established in 1967, the agency is mandated by Congress through the Independent Safety Board
Act of 1974 to investigate transportation accidents, determine the probable causes of the accidents, issue safety recommendations, study
transportation safety issues, and evaluate the safety effectiveness of government agencies involved in transportation. The Safety Board
makes public its actions and decisions through accident reports, safety studies, special investigation reports, safety recommendations, and
statistical reviews.
Recent publications are available in their entirety on the Web at <http://www.ntsb.gov>. Other information about available publications also
may be obtained from the Web site or by contacting:
National Transportation Safety Board
Public Inquiries Section, RE-51
490 LíEnfant Plaza, S.W.
Washington, D.C. 20594
(800) 877-6799 or (202) 314-6551
Safety Board publications may be purchased, by individual copy or by subscription, from the National Technical Information Service. To
purchase this publication, order report number PB2002-916501 from:
National Technical Information Service
5285 Port Royal Road
Springfield, Virginia 22161
(800) 553-6847 or (703) 605-6000
The Independent Safety Board Act, as codified at 49 U.S.C. Section 1154(b), precludes the admission into evidence or use of Board reports
related to an incident or accident in a civil action for damages resulting from a matter mentioned in the report.

<<<PAGE 5>>>

iii Pipeline Accident Report
Contents
Acronyms and Abbreviations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . v
Executive Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . vi
Factual Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
Accident Synopsis . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
The Accident . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
Actions Taken After Pipeline Shutdown . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
Response to Accident . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
Notifying Authorities and Containing Spill . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
Response to Escape From Containment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
Damage . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20
Personnel Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20
Postaccident Examination . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21
Tests and Research . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22
Piney Point Oil Pipeline . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24
Pipeline Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24
Operations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27
Pipeline Maps and Records . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28
Meteorological Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29
Pepco Oil Spill Preparedness . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29
Postaccident Actions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30
Office of Pipeline Safety Postaccident Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . 30
Pipeline Safety Actions Since Accident . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31
Other Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32
Incident Command System . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32
Postaccident Assessments of Chalk Point Response . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33
November 2000 Safety Board Hearing on Pipeline Safety . . . . . . . . . . . . . . . . . . . . . . 35
Analysis . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 36
The Accident . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 36
Pipeline In-line Inspection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37
Evaluation of Pipe Wrinkles . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37
Leak Detection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 38
Leak-related Notifications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41
Inaccurate National Response Center Notification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41
Limited Involvement of Local Response Agencies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43
Incident Command . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 44
Conclusions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 48
Findings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 48
Probable Cause . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 48
Recommendations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 49

<<<PAGE 6>>>

Contents iv Pipeline Accident Report
Appendixes
A: Investigation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 51
B: Initial Incident Timeline . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 52
C: Significant Events From Leak Recognition to Loss of Containment . . . . . . . . . . . . . . 53
D: Significant Environmental Response and Clean-up Events . . . . . . . . . . . . . . . . . . . . . . 54

<<<PAGE 7>>>

v Pipeline Accident Report
Acronyms and Abbreviations
API -- American Petroleum Institute
CFR -- Code of Federal Regulations
EPA -- Environmental Protection Agency
Mirant -- Mirant Piney Point, LLP
Pepco -- Potomac Electric Power Company
RSPA -- Research and Special Programs Administration
SCADA -- supervisory control and data acquisition
ST Services -- Support Terminal Services, Inc.

<<<PAGE 8>>>

vi Pipeline Accident Report
Executive Summary
On the morning of April 7, 2000, the Piney Point Oil Pipeline system, which was
owned by the Potomac Electric Power Company, experienced a pipe failure at the Chalk
Point Generating Station in southeastern Prince Georgeís County, Maryland. The release
was not discovered and addressed by the contract operating company, Support Terminal
Services, Inc., until the late afternoon. Approximately 140,400 gallons of fuel oil were
released into the surrounding wetlands and Swanson Creek and, subsequently, the
Patuxent River as a result of the accident. No injuries were caused by the accident, which
cost approximately $71 million for environmental response and clean-up operations.
The National Transportation Safety Board determines that the probable cause of
the April 7, 2000, Piney Point Oil Pipeline accident at the Potomac Electric Power
Companyís Chalk Point, Maryland, generating station was a fracture in a buckle in the
pipe that was undiscovered because the data from an in-line inspection tool were
interpreted inaccurately as representing a T-piece. Contributing to the magnitude of the
fuel oil release were inadequate operating procedures and practices for monitoring the
flow of fuel oil through the pipeline to ensure timely leak detection.
This report discusses the following major safety issues:
ï The sufficiency of the evaluation procedures for pipe wrinkles;
ï The efficiency of the leak notification procedures; and,
ï The effectiveness of the incident command.
In addition to these issues, the Safety Boardís investigation addressed the leak
detection procedures used on the Piney Point Oil Pipeline and the analysis of the pipeline
in-line inspection results.
As a result of its investigation of this accident, the Safety Board makes safety
recommendations to the Research and Special Programs Administration and the
Environmental Protection Agency.

<<<PAGE 9>>>

1 Pipeline Accident Report
Factual Information
Accident Synopsis
On the morning of April 7, 2000, the Piney Point Oil Pipeline system, which was
owned by the Potomac Electric Power Company (Pepco), experienced a pipe failure at the
Chalk Point Generating Station in southeastern Prince Georgeís County, Maryland. (See
figure 1 for a map showing the location of the Chalk Point Generating Station and the spill
site.) The release was not discovered and addressed by the contract operating company,
Support Terminal Services, Inc., (ST Services) until the late afternoon. Approximately
140,400 gallons1 of fuel oil were released into the surrounding wetlands and Swanson
Creek and, subsequently, the Patuxent River as a result of the accident. No injuries were
caused by the accident, which cost approximately $71 million for environmental response
and clean-up operations.
The Accident
At the time of the accident, Pepco was the owner of the Piney Point Oil Pipeline
system. ST Services, a limited partnership of the Kaneb Pipe Line Company, operated the
pipeline and performed certain maintenance functions according to the terms of its
contract with Pepco.2 The pipeline was used to deliver heated No. 6 fuel oil from Piney
Point Terminal, in Maryland, through an intermediate station at Ryceville, Maryland, to
Pepcoís power generating stations at either Chalk Point or Morgantown, Maryland. (See
figure 2.)
On April 7, 2000, a pigging operation was being conducted on the pipeline to
prepare the Chalk Point Station to Ryceville Station segment of the pipeline for an in-line
inspection. The pipeline from the Chalk Point Station to the Ryceville Station was started
in the reverse direction of normal flow with flushing oil3 in the system. (See figure 3 for a
schematic of the pipeline.) Employees calculated the amount of oil in the Chalk Point
flushing oil tank and the Ryceville receiving tank before the operation began. As the
operation proceeded, they obtained tank level data that would typically be used to
determine how much oil had been pumped from Chalk Point and how much had been
received by Ryceville.
1 Pipeline operators typically quantify their product using barrels rather than gallons. There are
42 gallons in a barrel.
2 In December 2000, Pepco sold some of its facilities, including the Piney Point Oil Pipeline and the
Chalk Point Generating Station, to Southern Energy, Inc., of Atlanta, Georgia. Southern Energy later became
Mirant Mid-Atlantic of Atlanta, Georgia. Currently, Mirant Piney Point, LLP, (Mirant) is the pipeline owner
and operator.
3 Flushing oil is a mixture of No. 2 and No. 6 fuel oil. No. 6 fuel oil is a thick, black petroleum liquid
that may become solid at cooler temperatures. No. 2 fuel oil is a light, refined petroleum product similar to
diesel fuel.

<<<PAGE 10>>>

Factual Information 2 Pipeline Accident Report
MARYLAND
Rt 301
PRINCE GEORGE'S
COUNTY
Oil Spill Site
CHARLES
COUNTY
Swanson Creek
PEPCO - Chalk Point
Generating Station
CALVERT
COUNTY
Benedict Route 231
ST. MARY'S
COUNTY
Patuxent
River
N
Major Roads
Figure 1. Map of accident site.

<<<PAGE 11>>>

Factual Information 3 Pipeline Accident Report
Waldorf
Oil
Spill
Site
Chalk Point
Station
5
301
La Plata
4
Hughesville
231
Morgantown
Station Ryceville
Station
5
Mechanicsville
301
234
5
235
Newburg
Patuxent River
4
301
Wicomico River
Potomac River
234
235
Leonardtown
5
PEPCO
Piney Point
Oil Pipeline
Valley Lee
Piney Point
Station
5
Figure 2. Locations of Piney Point Oil Pipeline Stations.
At 0715 eastern daylight time, ST Services employees (see figure 4) at the Chalk
Point Station started pumping and launched a cleaning pig. Before this operation began,
the estimated tank level that would indicate completion of the pigging process was
calculated for Chalk Point. The first pig was initially estimated to arrive at the Ryceville
Station 7 hours after it had been launched. Before launching the cleaning pig, the ST
Services Chalk Point operator walked through the tank and pipe manifold area and
measured the actual level4 of the flushing oil tank. Within 15 to 25 minutes, a sizing pig5
was launched to follow the cleaning pig.
The ST Services Chalk Point operator measured the first tank level at 0910. He
passed this information on to the crew at Ryceville, who had the tank volume conversion
tables that were used to determine the volume in the tank and calculate the oil flow rate.
The first tank gauge was read at Ryceville shortly after the crew arrived, about 0837. The
4 An operator obtains precise tank level measurements by climbing to the top of a tank carrying a
weighted tape, which is used to determine the liquid level in the tank.
5 The sizing pig was constructed to 90 percent of the pipelineís internal diameter to verify that the
pipeline did not have any internal restrictions that could damage or restrict the passage of an ultrasonic
inspection tool.

<<<PAGE 12>>>

PEPCO - Piney Point Oil Pipeline
Flushing
Wicomico River Swanson Creek
Oil
Morgantown Chalk Point
Tank
12" Pipeline 12" Pipeline
Flushing
Oil
Tank
Fuel Oil
Pump
Transfer
Station
Ryceville
Transfer Station
Fuel Oil
Pump
Transfer
Station
Flushing
Oil
Tank
Valve Pit #2
Valve Pit #1
Leak
Site
#6
Oil
Tank
#6
Oil
Tank
16" Pipeline
Legend
Water Crossing-
nitrogen operated valves
Manual isolation Valve
Tank
Piney Point
Transfer
Station
ST Services Terminal
Tank Tank
Piney Point
Figure 3. Piney Point Pipeline schematic.
Factual Information 4 Pipeline Accident Report

<<<PAGE 13>>>

ST Services
Senior Vice President, Mid-Atlantic Region
Director of Operations,
East Coast
Terminal Manager
Administrative
ASSISTANT TERMINAL
MANAGER
Traffic Analyst
MAINTENANCE
FOREMAN
PINEY POINT SHIFT SUPERVISORS
(function as PINEY POINT PIPELINE CONTROLLERS)
Plant Mechanics
(function as CHALK POINT AND
RYCEVILLE OPERATORS) Maintenance Workers-
Relief Operators
Operators (10 positions)
Figure 4. Selective organizational chart for ST Services. Positions cited in accident narrative are in boldface and all capitals. (Note:
This chart was developed by the Safety Board for informational purposes. It is not intended to cover the full range of ST Services
positions.)
Factual Information 5 Pipeline Accident Report

<<<PAGE 14>>>

Factual Information 6 Pipeline Accident Report
ST Services Ryceville operator determined that about 1,500 barrels (63,000 gallons) had
been transferred into the Ryceville tank since the pumping started. The ST Services
Ryceville operator kept some notes during the pumping but did not record the time and
tank level information in the station log.
Tank levels were taken at Chalk Point to be used to check the flow rate from the
facility at about 2-hour intervals for most of the pumping operation. The ST Services
Ryceville operator said he read the tank gauge at Ryceville, the receiving station, about
every 1 1/2 hours to determine the volume of product in the Ryceville tank. The operating
personnel did not provide tank volumes to the ST Services Chalk Point operator, and they
did not calculate the line balance6 periodically during the pigging operation. Further, they
did not communicate the tank level information to the ST Services Piney Point pipeline
controller7 when it was obtained.
At 1119, another tank level measurement was made at Chalk Point, and the ST
Services Chalk Point operator passed the information on to the ST Services Ryceville
operator. A few minutes before 1200, the ST Services Chalk Point operator told Ryceville
that the pumping was going well and that the cleaning pig would arrive early, between
1300 and 1330. At the same time, the ST Services Chalk Point operator asked Ryceville
what it was getting for volume received, as he had not had any confirmation on the
product pumped from his station to Ryceville. Ryceville told him the station was working
on it. As a normal check-in, the ST Services Chalk Point operator also called the ST
Services Piney Point pipeline controller to inform him that he was at the station and that
things were going fine.
The next Chalk Point tank level measurement was taken at 1220 and reported to
Ryceville and Piney Point. The ST Services Chalk Point operator stood by the Chalk Point
pump starting about 1250 and was prepared to shut it down whenever he received a call
from Ryceville stating that the cleaning pig had arrived. The tank gauge was checked at
Ryceville about 1300, but no information on the volume received was calculated or
reported to the ST Services Chalk Point operator or the ST Services Piney Point pipeline
controller. The ST Services Ryceville operator went outside to the Ryceville pipe manifold
about 1300 to await the cleaning pigís arrival. About 1412, the ST Services Chalk Point
operator decided to double-check the Chalk Point tank level because the pig had not
arrived at Ryceville.
About 1430, the Chalk Point pump started cavitating8 due to a low-pressure
condition at the pump inlet, because the level of product in the tank was not providing
sufficient pressure for the pump to run properly. About the same time, the ST Services
Ryceville operator noticed that Rycevilleís meter noise suddenly stopped, indicating no
6 Line balance is the difference between the volume of product pumped at the origin and the volume
received at the destination. It is used for determining whether the pipeline operation is being conducted
within certain limits in order to identify a possible leak.
7 The ST Services Piney Point shift supervisors served as the pipeline controllers.
8 Cavitation is an internal pump condition created by the sudden formation and collapse of bubbles in
a liquid, which makes a characteristic sound.

<<<PAGE 15>>>

Factual Information 7 Pipeline Accident Report
product flow. The ST Services Chalk Point operator kept the pump operating by partially
closing the pump outlet valve in an effort to avoid internal damage to the pump.
The ST Services Chalk Point operator talked to the ST Services maintenance
foreman at Ryceville and was told that the meter noise had stopped and no pig had arrived.
The ST Services Chalk Point operator was then directed to close the valve as much as
possible to maintain product flow. The ST Services Chalk Point operator had not taken a
recent tank level measurement but was now ordered by the ST Services maintenance
foreman to determine the Chalk Point tank level. The ST Services Ryceville operator was
also directed to measure the Ryceville tank level so that the volume pumped could be
compared with the volume received. The ST Services assistant terminal manager was
notified about the situation, and he confirmed the need for an immediate tank level
measurement of the pumping and receiving tanks.
The ST Services Chalk Point operator and the ST Services assistant terminal
manager had a phone conversation about 1440 and reviewed the situation. The ST
Services assistant terminal manager instructed the ST Services Chalk Point operator to
double-check which valves were closed to confirm that the No. 6 fuel system was isolated
from the flushing oil system.
Tank levels were acquired for Chalk Point and Ryceville. The ST Services
Ryceville operator, using the tank volume tables, calculated that enough oil had been
pumped for the pigs to have reached the Ryceville Station. He said he thought that
something was wrong because Ryceville did not receive all the oil pumped from Chalk
Point.
The ST Services assistant terminal manager later said that at the time he believed
that the tank volume discrepancy had been caused by a valve that was improperly aligned
(open to another tank) or leaking (product leaking through a valve to another tank) and
that flushing oil was being transferred to the No. 6 fuel oil tank. He then directed ST
Services employees to make a number of checks to confirm that the correct valves were
open, to obtain a reading of the No. 6 fuel oil meters at Chalk Point, and to measure the
tanks at Piney Point. The ST Services assistant terminal manager had the ST Services
Piney Point pipeline controller perform the line balance calculations, with the result that
3,088.7 barrels (129,725 gallons) could not be accounted for.
By 1534, after receiving the additional information he had requested, the ST
Services assistant terminal manager stated that the discrepancies could not be explained
by tank inventory data. He had ruled out the possibility of the missing oil being anywhere
it should be. During a phone call, the ST Services Chalk Point operator told the ST
Services assistant terminal manager that the requested check had confirmed the isolation
of the flushing oil system from the No. 6 fuel oil. The ST Services assistant terminal
manager told the ST Services Chalk Point operator to shut the Chalk Point pump down. At
1538, the ST Services Chalk Point operator shut down the pump. The ST Services
assistant terminal manager stated that he paged his Pepco pipeline contact, the Pepco
Chalk Point general supervisor for fuel and ash, three times using a ì911 codeî to indicate
the urgent need for a response. (See figure 5 for an organizational chart of Pepco
personnel involved in the accident.)

<<<PAGE 16>>>

PEPCO Generation Organization
Vice President
Environmental
Engineering and
Maintenance Services
Bulk Power
Management
Fuels and Business
Planning
Generation East-
CHALK POINT
GENERATING
STATION MANAGER
Division Manager
ENGINEERING
SUPERVISOR
Environmental Services
Manager
Operations
Fuel and Ash
SENIOR
ENVIRONMENTAL
COORDINATOR
Station
Engineering
Maintenance
and Planning
GENERAL SUPERVISOR
FOR OPERATIONS
GENERAL SUPERVISOR
FOR FUEL AND ASH
ENVIRONMENTAL
COORDINATOR
(also QUALIFIED INDIVIDUAL)
CHALK POINT CONTROL ROOM
OPERATIONS SUPERVISOR
CHALK POINT SHIFT
SUPERVISOR
Figure 5. Selective and simplified organization chart for Pepco Generation Organization, intended only to
show the basic organizational relationships between the major positions cited in the accident narrative. Positions
cited in the narrative are in boldface and all capitals. (Note: This chart was developed by the Safety Board for
informational purposes. It is not intended to cover the full range of Pepco Generation Organization positions.)
Factual Information 8 Pipeline Accident Report

<<<PAGE 17>>>

Factual Information 9 Pipeline Accident Report
Actions Taken After Pipeline Shutdown
The ST Services assistant terminal manager told the ST Services Chalk Point
operator that he had pumped about 8,900 barrels (373,800 gallons) and that Ryceville had
received about 5,900 barrels (247,800 gallons). The ST Services assistant terminal
manager then directed the ST Services Chalk Point operator to check the No. 1 valve pit
area at Swanson Creek for a leak and to look across the creek at the No. 2 valve pit for
signs of a leak. (Valve pit No. 1 is on the north side of Swanson Creek, between the creek
and the Chalk Point Station.) The ST Services Chalk Point operator also obtained the
closing tank level for the Chalk Point flushing oil tank.
The ST Services Chalk Point operator made the visual checks by 1545 and
reported that he saw no sign of an oil leak at the creek. Next, the ST Services Chalk Point
operator was directed to check all roads that the pipeline crossed back to Ryceville for an
oil leak. He called the Chalk Point Operations Center and stated that he was finished
pumping and that the pigs had not been received at Ryceville, indicating there was a
problem with the pipeline. He said he told the Chalk Point Operations Center that he was
checking road crossings and would contact the center if he noticed a leak or some other
problem.
At 1550, the ST Services assistant terminal manager called a Pepco Washington,
D.C., headquarters oil procurement employee who confirmed the pager number for the
Pepco Chalk Point general supervisor for fuel and ash. The contact also provided the
Pepco engineering supervisorís phone number, because the Pepco engineering supervisor
might be able to locate other contacts needed by the ST Services assistant terminal
manager.
The ST Services assistant terminal manager contacted the Pepco engineering
supervisor, who advised him that the Pepco Chalk Point general supervisor for fuel and
ash was on vacation. The ST Services assistant terminal manager told him the details of
the 3,000-barrel line balance discrepancy and was advised to call the Pepco Chalk Point
general supervisor for operations. The ST Services assistant terminal manager also stated
that ST Services personnel were checking the levels of the flushing oil and No. 6 fuel oil
tanks at Chalk Point, Morgantown, and Piney Point to determine the location of a 3,000-
barrel line balance discrepancy. The ST Services assistant terminal manager indicated that
similar discrepancies had occurred in the past due to valve misalignment or valves not
being fully closed, which allowed oil to be inadvertently directed into one of the other oil
storage tanks in the system.
The Pepco engineering supervisor said that about 1620, he called the Pepco Chalk
Point general supervisor for operations and informed him of a 2,000- to 3,000-barrel line
balance discrepancy, which the Pepco Chalk Point general supervisor for operations noted
in his log as a discrepancy of 2,000 barrels. The Pepco Chalk Point general supervisor for
operations also noted in his log that ST Services personnel had initiated a ground
inspection and were checking the pipeline at road crossings. At 1643, the Pepco Chalk
Point general supervisor for operations ordered a patrol flight of the pipeline right-of-way.

<<<PAGE 18>>>

Factual Information 10 Pipeline Accident Report
Response to Accident
Notifying Authorities and Containing Spill
April 7. About 1800 or shortly thereafter, the Pepco Chalk Point general supervisor
for operations called the on-duty Pepco environmental coordinator, who was the
designated Pepco qualified individual,9 at home to discuss the pipeline line balance
shortage. He told the Pepco qualified individual what was being done at the pipeline,
including the tank level measurement discrepancy found when oil had been pumped back
to Ryceville. The Pepco Chalk Point general supervisor for operations also said that he
had ordered a pipeline patrol flight.
At 1802, the ST Services assistant terminal manager learned that during the
pipeline patrol plane flight, an oil release from the Piney Point Oil Pipeline had been
spotted in the Swanson Creek wetlands area. By 1807, the ST Services assistant terminal
manager had put the Chalk Point pipeline emergency response plan into effect by
contacting the Pepco qualified individual and an oil spill clean-up contractor. This plan
listed the criteria for notification of local response agencies as ìfire, explosion, personal
injury or release or significant threat of release off-site.î Local response agencies were not
notified. The ST Services assistant terminal manager called Piney Point to summon ST
Services employees to assist at Chalk Point. (See appendix B for a timeline indicating
significant developments as the leak occurred and was identified.)
The Pepco qualified individual called the Pepco Chalk Point general supervisor for
operations back and reported that the pipeline patrol flight had found an oil spill. The
Pepco Chalk Point general supervisor for operations then notified the Chalk Point control
room of the pipeline release.
The Pepco Chalk Point general supervisor for operations sent the Pepco Chalk
Point shift supervisor to the pipeline crossing at Swanson Creek to assess the situation.
During this period, the Pepco Chalk Point general supervisor for operations reviewed the
three Pepco spill response plans for the area to ensure that all emergency response
requirements were being met.10 Because each plan had a somewhat different purpose and
focus and the general supervisor for operations did not know the exact location of the
(underground) spill, he did not know which plan applied to this accident. Consequently, he
attempted to notify all response personnel identified in all three plans.
9 As indicated under 49 Code of Federal Regulations (CFR) Part 194, the qualified individual is a
company representative available on a 24-hour basis with full authority to: activate personnel and contract
with required oil spill removal organization(s); activate personnel and equipment maintained by the
operator; act as liaison with the on-scene coordinator; and obligate funds needed to carry out all required or
directed oil response activities.
10 The three plans were 1) the Pepco Oil Spill Emergency Response Plan for the Ryceville Pumping
Station and Pipeline, 2) the Pepco Oil Spill Emergency Response Plan for the Chalk Point Generating
Station, and 3) the Pepco Spill Prevention, Control, and Emergency Response Plan for the Chalk Point
Generating Station.

<<<PAGE 19>>>

Factual Information 11 Pipeline Accident Report
About 1817, the Pepco Chalk Point shift supervisor called the Pepco Chalk Point
general supervisor for operations and reported that he would deploy an oil spill boom to
contain the oil in Swanson Creek.
At 1822, the ST Services assistant terminal manager asked the Pepco Chalk Point
control room operations supervisor to notify Federal and State agencies about the release,
as required by the oil spill response plan for the Chalk Point Generating Station. About
1827, the Pepco Chalk Point general supervisor for operations called the headquarters
Pepco senior environmental coordinator at home and discussed the oil spill, so that the
Pepco senior environmental coordinator could notify the National Response Center.11
Between 1830 and 1835, the Pepco qualified individual met the Pepco Chalk Point
shift supervisor (who had been to the leak site) at the Chalk Point plant building and asked
the shift supervisor how much oil had spilled. When the Pepco Chalk Point shift
supervisor responded that he was not sure, the Pepco qualified individual pressed him for
some number because, he said, he believed that he would have to report a spill quantity
when he called the responsible authorities. The Pepco qualified individual stated that,
when pressed, the Pepco Chalk Point shift supervisor said, ì1,000 gallons, 2,000 gallons,
[expletive] mess; tell them what you want.î
They reported together to the office of the Pepco Chalk Point general supervisor
for operations about 1835, during his continuing telephone conversation with the Pepco
senior environmental coordinator. The Pepco qualified individual told the Pepco Chalk
Point general supervisor for operations that the estimated size of the spill was 1,000 to
2,000 gallons. The Pepco senior environmental coordinator later told investigators that
during their phone conversation, he and the Pepco Chalk Point general supervisor for
operations discussed that the ìbest guessî estimate of the release was 1,000 to
2,000 gallons. He stated that he and the Pepco Chalk Point general supervisor for
operations agreed to report a release of 2,000 gallons to the National Response Center.
The Pepco senior environmental coordinator stated that the Pepco Chalk Point general
supervisor for operations did not discuss the ST Services tank level readings with him.
Shortly thereafter, the Pepco senior environmental coordinator called the Pepco
qualified individual for more information about the release. The Pepc