# Natural Gas Pipeline Leak, Explosion, and Fire

- **operation:** document
- **citation:** DCA04MP006
- **title:** Natural Gas Pipeline Leak, Explosion, and Fire
- **source type:** incident
- **agency:** National Transportation Safety Board
- **status:** current
- **official:** true
- **published on:** 2026-01-30
- **effective on:** 2004-08-21
- **summary:** Accident. in DuBois, PA, USA. on 2004-08-21. National Fuel Gas Distribution Corporation. Leak/explosion/fire
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/ntsb-case-dca04mp006.json
- **markdown:** https://regulus.evalyn.ai/document/ntsb-case-dca04mp006.md
- **app url:** https://regulus.evalyn.ai/document/ntsb-case-dca04mp006
- **source url:** https://www.ntsb.gov/investigations/Pages/DCA04MP006.aspx
**body:**

NTSB investigation DCA04MP006.

Event Type: Accident

Event Date: 2004-08-21

Event City: DuBois

Event State Or Region: PA

Event Country: USA

Pipeline Operator: National Fuel Gas Distribution Corporation

Pipeline Type: Distribution

Accident Type: Leak/explosion/fire

Completion Status: Completed

Report Number: PAB-06-01

Probable cause: The National Transportation Safety Board determines that the probable cause of the leak, explosion, and fire in DuBois, Pennsylvania, on August 21, 2004, was the fracture of a defective butt-fusion joint and the failure of the National Fuel Gas Distribution Corporation to have an adequate program to inspect butt-fusion joints and replace those joints not meeting its inspection criteria.

Tier1Name: System operating

Tier2Name: Fire/explosion (post-release)

Tier1Name: System operating

Tier2Name: Product leak/release

Finding Tier1Name: Organizational

Finding Tier2Name: Support/oversight/monitoring

Finding Tier3Name: Oversight

Finding Modifier Name: State/Local agency

Finding Report Text: Organizational - Support/oversight/monitoring - Oversight - State/Local agency

Finding Tier1Name: Organizational

Finding Tier2Name: Support/oversight/monitoring

Finding Tier3Name: Safety programs

Finding Modifier Name: Other institution/organization

Finding Report Text: Organizational - Support/oversight/monitoring - Safety programs - Other institution/organization

Finding Tier1Name: Personnel

Finding Tier2Name: Experience/knowledge

Finding Tier3Name: Skill/ability

Finding Modifier Name: Other company personnel

Finding Report Text: Personnel - Experience/knowledge - Skill/ability - Other company personnel

Finding Tier1Name: Pipeline

Finding Tier2Name: Pipeline structure

Finding Tier3Name: Joint/weld/seam

Finding Modifier Name: Failure

Finding Report Text: Pipeline - Pipeline structure - Joint/weld/seam - Failure

Official NTSB investigation data. NTSB findings determine probable cause and make safety recommendations; they do not adjudicate civil liability or regulatory violations.

What Happened
On August 21, 2004, about 8:54 a.m., a natural gas explosion destroyed a residence located at 48 Woodland Lane in DuBois, Pennsylvania. The two residents were killed in this accident.

What We Found
We determined that the probable cause of the leak, explosion, and fire in DuBois, Pennsylvania, on August 21, 2004, was the fracture of a defective butt-fusion joint and the failure of the National Fuel Gas Distribution Corporation to have an adequate program to inspect butt-fusion joints and replace those joints not meeting its inspection criteria.

What We Recommended
As a result of this investigation, we made the following new safety recommendations.

To the Pennsylvania Public Utility Commission: Require an analysis of the integrity of butt-fusion joints in National Fuel Gas Distribution Corporation’s gas distribution system and replacement of those joints that are determined to have unacceptable characteristics. (P-06-1)

To National Fuel Gas Distribution Corporation:

Revise your butt-fusion procedures for plastic pipe to include a requirement for determining drag force in the field for each butt-fusion joint. (P-06-2)
Revise your initial qualification and requalification procedures for plastic gas pipe to ensure fusers produce test joints made from coiled pipe with characteristics similar to those experienced in the field. (P-06-3)

To USPoly Company: Revise your butt-fusion procedures to include a requirement for the avoidance of mitering in plastic gas pipe joints. (P-06-4)

To the Plastics Pipe Institute: Revise your butt-fusion joining procedure for plastic gas pipe to (1) stress the importance of inspecting the finished joint, (2) include guidance on the joining of
coiled pipe, and (3) include a requirement for the avoidance of mitering. (P-06-5)

PAB-06-01
<<<PAGE 1>>>

L
T
R
A
N
S
P
A
O
N
R
U
R
I
B
U
S
M
T
O
I
A
T
A
U N U
P
L
E
T
I
O
N
N
S
A
F
E
T
Y
B
D
O
A
R
National Transportation Safety Board
Washington, D.C. 20594
Pipeline Accident Brief
Accident No.: DCA-04-MP-006
System Type: Natural gas distribution
Accident Type: Leak, explosion, and fire
Location: DuBois, Pennsylvania
Date: August 21, 2004
Time: About 8:54 a.m. eastern daylight time1
Owner/Operator: National Fuel Gas Distribution Corporation
Property Damage and Losses: $800,000
Fatalities: 2
Injuries: None
Material Released: Natural gas
Pressure: 50 pounds per square inch, gauge
Failure Type: Butt-fusion joint leak
Component Affected: 2-inch plastic main line
The Accident
On August 21, 2004, about 8:54 a.m., a natural gas explosion destroyed a residence
located at 48 Woodland Lane in DuBois, Pennsylvania. The two residents were killed in this
accident. (See figure 1.)
Postaccident Investigation
National Fuel Gas Distribution Corporation (National Fuel) probed the ground near the
residence for gas leaks. Combustible gas-to-air readings were found in two areas: one area was
adjacent to the affected residence, and the other area was directly over the failed pipe on the front
lawn. After the explosion, National Fuel excavated the front lawn. The excavation revealed a
leaking butt-fusion joint in a 2-inch-diameter plastic main line pipe. (See figure 2.)
A butt-fusion joint is made by the following process. A heater plate is inserted between
two pipe ends, melting the material on each end. The heater is then removed, and the pipe ends
are pushed together under applied force. The pipe ends remain under applied force as the pipe
ends cool and fuse together. The butt-fusion process forces excess molten plastic onto the inside
and outside of the pipe surfaces. Because both sides of the pipe are molten, two visible beads are
formed on the exterior and interior of the pipe joint. (See figure 3.) When this material cools and
solidifies, it is called a fusion bead.
1 All times in this brief are eastern daylight time.
NTSB/PAB-06/01

<<<PAGE 2>>>

Figure 1. Damage to 48 Woodland Lane.
National Fuel began excavating the accident site before National Transportation Safety
Board investigators arrived. During the excavation, National Fuel accidentally severed the plastic
pipe within a few feet of the butt-fusion joint. Because of this mishap, Safety Board investigators
could not determine the undisturbed position of the pipe to assess its bending. Only a small
ligament remained connected at the butt-fusion joint, making it impossible to directly test the
strength of the joint.
The Safety Board’s examination of the butt-fusion joint linked to the explosion indicates
that the bead widths were not uniform.2 The bead width on one side of the butt-fusion joint
ranged from 0.0535 inch to 0.1135 inch. On the other side of the joint, the bead width ranged
from 0.0745 inch to 0.1060 inch. The total bead width ranged from 0.1315 inch to 0.2045 inch.
The joint was found to have been visibly mitered,3 having about a 2° angle. Mitering can
concentrate stresses. No evidence was found indicating that the joint was significantly
misaligned.4
2 See butt-fusion criteria discussed in the section titled Butt-Fusion Procedures and Inspection Criteria,
Preaccident.
3 Mitered means a butt-fusion joint that is not joined with an 180° angle from each pipe. In this report, mitering
refers to a small angle made unintentionally in the field, not a large angle made intentionally as a pipe bend. A
visible miter is a joint that has an angle detectable by the unaided eye.
4 Misaligned means a butt-fusion joint in which the two pipes are not evenly lined up relative to each other,
exhibiting a high-low disjuncture at the point of fusion.
2 NTSB/PAB-06/01

<<<PAGE 3>>>

Figure 2. Excavated butt-fusion joint.
3 NTSB/PAB-06/01

<<<PAGE 4>>>

Figure 3. Optimal butt-fusion joint as illustrated in Uponor’s Heat Fusion Installer
Qualification Manual.
At the same location where the external bead width was thinnest, the bead was distorted.
The external bead on one side of the joint was larger than the bead on the other side. The
boundary between the two beads was indistinct. The internal bead was also distorted, with the
bead on one side of the joint higher than the other side. On one side of the joint, the internal bead
had numerous pockmarks.5 On the other side, small globules of plastic adhered to the bead,
which is consistent with material being pulled from one bead and deposited on the other bead
when the joint was made.
The fracture between the two pipe ends closely followed the plane of the center of the
butt-fusion joint. (See figure 4.) The external bead remained attached to one piece of the pipe,
and the internal bead remained attached to the other piece of the pipe. (See figure 5.)
5 Pockmarks may indicate a less than optimal butt fusion.
4 NTSB/PAB-06/01

<<<PAGE 5>>>

Figure 4. Fractured end showing external bead and plane of fracture at center of
butt-fusion joint.
Figure 5. View of fracture surface on one piece of pipe. Pipe is oriented as it was
found. Fracture origin was at 9 o’clock position as shown. Unlabeled arrows
indicate crack propagation directions.
5 NTSB/PAB-06/01

<<<PAGE 6>>>

The fracture surfaces at the butt-fusion joint were examined using optical microscopy and
an environmental scanning electron microscope. The fracture surface exhibited voids where the
internal and external beads were distorted. (See figure 6.) Fracture surface features indicated that
the crack initiated near the center of the pipe wall within the butt-fusion joint, followed by a slow
progressive crack growth.6 Ductile ribbons of plastic pipe material present at the inner and outer
edges of the fracture surface indicated that the crack did not initiate at the notches7 of either the
internal or external beads.
Studies of butt-fusion joints subjected to elevated temperature and high pressure indicate
that a fracture occurring in the butt-fusion area will normally start on the pipe wall surface at the
notch of the internal bead or, if bending is involved, the fracture would be expected to start at the
outer pipe wall surface. However, the initiation of the fracture in the accident pipe near the center
of the pipe wall is consistent with inadequate fusion of the joint.
Figure 6. Voids in central portion of fracture surface.
6 See National Transportation Safety Board Brittle-like Cracking in Plastic Pipe for Gas Service, Special
Investigation Report NTSB/SIR-98/01 (Washington, DC: NTSB, 1998), for additional information regarding
progressive crack growth.
7 As the bead rolls back, a notch is formed between the bead and the wall of the pipe. Stress concentration
increases in the area of the notch.
6 NTSB/PAB-06/01

<<<PAGE 7>>>

The butt-fusion joint that joined the two coiled plastic pipes8 involved in this accident
was made on January 10, 1996, using a machine called the McElroy 14, which is manufactured
by McElroy Manufacturing, Inc. (McElroy). The two plastic pipes were manufactured in
different years. One pipe was manufactured on May 16, 1995; the other was manufactured on
October 5, 1994. Uponor Aldyl Company (Uponor) manufactured both medium-density9 pipes.
According to written certifications from Uponor, the pipe met the requirements of ASTM
D-2513, “Standard Specification for Thermoplastic Gas Pressure Pipe, Tubing, and Fittings.”
Laboratory testing of the accident pipe determined that the dimensions, density, and melt index
were within Uponor’s production specifications.
Butt-Fusion Procedures and Inspection Criteria
Preaccident
Uponor had a butt-fusion joining procedure, adopted in December 1991, for its pipe
product. Uponor qualified its joining procedure in accordance with Title 49 Code of Federal
Regulations (CFR) 192.283.10 As a service to National Fuel and other pipeline companies,
Uponor provided its procedure.
National Fuel had its own procedure for making butt-fusion joints. The butt-fusion
joining procedures for National Fuel and Uponor were similar. The National Fuel butt-fusion
procedure was adopted in February 1993. National Fuel made butt-fusion joints using a variety
of machines. The company inspected and certified its butt-fusion machines in accordance with its
procedures.
Uponor published a set of key visual inspection criteria for identifying an acceptable
butt-fusion joint. These criteria were in effect in 1996 at the time the fusion joint involved in the
accident was made. As stated in Uponor’s inspection criteria (adjacent to photographs of
butt-joint fusions), key visual criteria for a good-quality fusion included the following:
• Uniform bead development on both pipe ends
• Bead rolled back to pipe
• No misalignment between pipe ends
8 Butt fusion of coiled pipe is considered more difficult than fusion of straight pipe because the residual
curvature makes it difficult to obtain an optimal alignment and reduce mitering. Proper procedures and equipment
and extra care are necessary if high-quality joints are to be consistently produced.
9 Medium density is characterized in ASTM D-2513. ASTM is now known as ASTM International, one of the
largest voluntary standards development organizations in the world. ASTM was originally an abbreviation for
American Society for Testing and Materials.
10 Title 49 CFR 192.283 is issued by the U.S. Department of Transportation Pipeline and Hazardous Materials
Safety Administration in Part 192, “Transportation of Natural and Other Gas by Pipeline: Minimum Federal Safety
Standards;” Subpart F, “Joining of Materials Other Than by Welding;” Section 192.283, “Plastic pipe: Qualifying
joining procedures.”
7 NTSB/PAB-06/01

<<<PAGE 8>>>

In addition, the Uponor procedure stated that joints not meeting these visual criteria had to be
remade before being placed into service. The Uponor procedure further stated, “If the pipe ends
are not aligned, adjust them in the shells and . . . [start over].” This procedure did not address
mitering.
National Fuel essentially used Uponor’s inspection criteria. As part of its procedure for
making a butt-fusion joint, National Fuel required the fuser11 to inspect the completed joint for
conformity with its criteria. National Fuel’s procedure also stated, “If there is any reason to
believe a butt fusion is defective, it shall be removed and replaced.”
Safety Board investigators interviewed two current and two retired National Fuel
employees familiar with National Fuel’s fusion procedures and training at the time when the
subject butt-fusion joint was made. The four interviewees included two master trainers who
conducted initial qualification training and two foremen who requalified personnel in the field
based on instructions from the master trainers. The interviewees stated that National Fuel had
verbal instructions in effect in 1996 advising its fusers not to allow a visual miter; however, this
guidance was not found in its written operating procedures.
The butt-fusion joint linked to the explosion was made with a 500-foot length of 2-inch
coiled pipe that was butt fused to a previously installed 2-inch coiled pipe using the McElroy 14.
According to the National Fuel butt-fusion procedure, the fusion required the fuser to apply 15 to
20 foot-pounds with the machine, which would have resulted in a joining force on the pipe ends
of 165 to 215 pounds. A 500-foot roll of 2-inch plastic pipe weighs approximately 315 pounds.
Depending on the placement of the pipe roll, the drag caused by the weight of the pipe roll could
have been negligible or significant. The written procedures of Uponor, National Fuel, and
McElroy did not account for drag force;12 however, McElroy’s onsite training program provided
instructions to fusers so that they could determine in the field the drag force for a butt-fusion
joint. Among the four National Fuel interviewees, there was variation in the level of knowledge
regarding drag force and the need to compensate for its effects.
Current
Since the accident, the PWPoly Corporation has acquired Uponor. The combined
businesses of PWPoly Corporation and Uponor operate under the name USPoly Company
(USPoly). Today, USPoly continues to manufacture medium-density pipe, but it no longer
manufactures the type of pipe involved in this accident.
USPoly’s March 5, 2000, pipe joining procedure addresses the methods for joining coiled
pipe using butt fusion and recommends that drag force be determined on a case-by-case basis. Its
procedure requires that the completed joint be inspected and prescribes that any joint not meeting
8 NTSB/PAB-06/01
11 A fuser is a person who makes fusion joints.
12 The fusion of a long or heavy segment of pipe is different from the fusion of two small segments of plastic
pipe. Drag force is the force required to move the pipe to be joined. If this drag force is not added before applying
the joining force, the proper joining force may not be applied.

<<<PAGE 9>>>

visual inspection criteria be remade. The USPoly procedure does not address mitering. USPoly’s
key visual inspection criteria for its medium-density pipe product include the following:
• Complete and uniform beads
• Bead rolled back to pipe
• Alignment
The Plastics Pipe Institute (PPI) is the major trade association representing the plastics
piping industry. The PPI publishes universal fusion procedures that are widely accepted
throughout the pipeline industry. PPI’s current butt-fusion joint procedure, published in late
2005, recommends that the drag force be determined on a case-by-case basis. The PPI procedure
does not address the joining of coiled pipe or the avoidance of mitering. The PPI procedure
includes an illustration of a properly made butt-fusion joint, but it does not specifically address
inspecting the finished joint.
In November 2000, McElroy, the manufacturer of the McElroy 14, established
butt-fusion procedures that recommend determining drag force on a case-by-case basis. In
addition, McElroy specifies using PPI’s fusion procedures or the pipe manufacturer’s procedures
for certain fusion parameters, such as joining force and holding time.
ASTM D-2657, “Standard Practice for Heat Fusion Joining of Polyolefin Pipe and
Fittings,” contains a general butt-fusion joint procedure. The ASTM procedure requires the use
of PPI or pipe-manufacturer procedures to specify the fusion parameters. The ASTM procedure
further prescribes inspecting the finished joint in accordance with recommended appearance
guidelines. The ASTM procedure also addresses calculating and using a drag force.
National Fuel’s current butt-fusion procedure,13 published in May 2005, addresses joining
coiled pipe. This procedure adds a predetermined fixed drag force for some fusion machines. As
a part of its operating procedure, National Fuel requires the fuser to inspect the completed
butt-fusion joint. This visual examination of the butt fusion includes proper alignment, no miter,
complete bead rollover, relatively uniform beads, and proper bead width. National Fuel’s current
procedure states, “If there is any reason to believe the butt fusion is defective, it shall be removed
and replaced.” A butt-fusion joint made by a fuser in the field is subject to inspection by a
foreman. Since January 1, 2000, National Fuel’s Quality Assurance/Quality Control department
has been performing periodic field audits that sometimes include inspections of butt fusions,
depending upon the subject of the audit. The fusers have been required to use a permanent
marker to write their employee identification number on their butt -fusion joints since
January 2001.
13 National Fuel’s current policy does not permit two segments of coiled pipe to be butt fused; however, a
straight pipe can be butt fused to coiled pipe.
9 NTSB/PAB-06/01

<<<PAGE 10>>>

Qualification of Fusion Personnel
Preaccident
Title 49 CFR 192.285 required that all personnel making plastic pipe joints be qualified
under the applicable joining procedure. To qualify, the applicant had to have appropriate training
or experience using the procedure and had to produce at least one joint using it. These joints
were visually examined and mechanically tested by one of several approved methods, which
included pressure testing, tensile testing, and cutting the joint into a minimum of three strips and
bending them to failure. This testing was required for qualification and requalification.
Two qualified fusers were on the National Fuel work crew that installed the 2-inch plastic
pipe on January 10, 1996. One of these fusers signed a form indicating that he had made the
butt-fusion joint where the failure occurred. He also signed the chart of the final pressure test
before this pipeline segment was placed in service.
According to National Fuel records, both work crew fusers passed their original plastic
pipe butt-fusion qualification tests. Both work crew fusers requalified in 1994, 1995, and 1996.
During their requalification tests, they used a variety of butt-fusion machines, including the
McElroy 14. Their requalification testing was performed in accordance with 49 CFR 192.285.
Their requalification records indicate that they received a review of procedures. The fusers were
not given a written examination, and records did not reflect whether they were requalified using
coiled or straight pipe. Neither crew fuser, according to National Fuel records, had a documented
failed joint.
Current
In its fuser qualification plan, National Fuel has two levels of training and qualification:
initial qualification and requalification. New employees who produce plastic fusions and fitting
installations are required to take an initial training course. The course reviews the National Fuel
procedures, best practices for plastic material installation, and fusion and mechanical coupling
installation. Individuals performing plastic joining are requalified on an annual basis. Both the
initial and requalification programs include instructional videos, reviews of updated or changed
operating procedures, and changes in materials or products. Both a written test and a practical
exam are given. The trainee must be able to differentiate between acceptable and unacceptable
fusions. The trainee is required to make test joints that may or may not be made from coiled pipe.
These joints are visually examined by the trainer and then evaluated by mechanical testing. To
qualify an individual for the inspection of fused plastic pipe, National Fuel requires the
individual to pass either a written or an oral examination and to understand how to determine that
a joint meets National Fuel’s acceptance criteria. On March 8, 2004, two Pennsylvania Public
Utility Commission (PUC) inspectors audited National Fuel’s program. No issue regarding
National Fuel’s butt-fusion operator qualifications was identified in the audit report.
10 NTSB/PAB-06/01

<<<PAGE 11>>>

Additional Fusions Removed from DuBois
The Pennsylvania PUC supervised the excavation and visual inspection of an additional
40 joints from an area in the vicinity of the accident that were made in either 1994 or 1996.
Inspectors from the Pennsylvania PUC removed 24 of the joints and submitted them to the
Safety Board for laboratory analysis.
Of the 24 joints examined at the Safety Board’s Materials Laboratory, 5 were made from
straight pipe, and 19 were made from coiled pipe. The five joints made from straight pipe were
found to have sufficiently uniform beads, complete bead rollover, no visible miter, and proper
alignment.
About half of the 19 joints made from coiled pipe had visible variation in bead width, but
all were relatively uniform. All of the 19 joints had complete bead rollover. The 19 joints had
miter angles that were greater than those on the straight pipe joints; the miter angles for the joints
made from coiled pipe ranged from 0.7° to 4.2°. The average angle of the miter for the 19 joints
was 2.08°. Thirteen of the 19 joints made from coiled pipe had a misalignment in excess of that
allowed by National Fuel and Uponor. Two joints had an area that separated in the joint during
tensile testing. These two joints had regions of poor bonding in the fusion area; one of the joints
exhibited voids similar to those observed on the fracture surface of the accident joint.
Records to identify a specific fuser with any of the 24 joints examined by the
Safety Board’s Materials Laboratory were unavailable. National Fuel records show that in 1994
there were nine qualified fusers and in 1996 there were seven qualified fusers who could make
butt-fusion joints in the DuBois Service Center area.
Gas System Performance Monitoring
Federal regulations (49 CFR 192.613 and 192.617) require that gas pipeline system
operators have procedures in place for monitoring the performance of their gas systems. These
procedures must cover surveillance of gas system failures and leakage history, analysis of
failures, submission of failed samples for laboratory examination (to determine the causes of
failure), and minimizing the possibility of future recurrences. National Fuel has reported that it is
revising its surveillance and analysis program to address the integrity of butt-fusion joints.
Probable Cause
The National Transportation Safety Board determines that the probable cause of the leak,
explosion, and fire in DuBois, Pennsylvania, on August 21, 2004, was the fracture of a defective
butt-fusion joint and the failure of the National Fuel Gas Distribution Corporation to have an
adequate program to inspect butt-fusion joints and replace those joints not meeting its inspection
criteria.
11 NTSB/PAB-06/01

<<<PAGE 12>>>

Recommendations
As a result of its investigation of the August 21, 2004, DuBois, Pennsylvania, pipeline
accident, the National Transportation Safety Board makes the following safety
recommendations:
To the Pennsylvania Public Utility Commission:
Require an analysis of the integrity of butt-fusion joints in National Fuel Gas
Distribution Corporation’s gas distribution system and replacement of those joints
that are determined to have unacceptable characteristics. (P-06-1)
To National Fuel Gas Distribution Corporation:
Revise your butt-fusion procedures for plastic pipe to include a requirement for
determining drag force in the field for each butt-fusion joint. (P-06-2)
Revise your initial qualification and requalification procedures for plastic gas pipe
to ensure fusers produce test joints made from coiled pipe with characteristics
similar to those experienced in the field. (P-06-3)
To USPoly Company:
Revise your butt-fusion procedures to include a requirement for the avoidance of
mitering in plastic gas pipe joints. (P-06-4)
To the Plastics Pipe Institute:
Revise your butt-fusion joining procedure for plastic gas pipe to (1) stress the
importance of inspecting the finished joint, (2) include guidance on the joining of
coiled pipe, and (3) include a requirement for the avoidance of mitering.
(P-06-5)
12 NTSB/PAB-06/01

<<<PAGE 13>>>

BY THE NATIONAL TRANSPORTATION SAFETY BOARD
Mark V. Rosenker
Acting Chairman
Ellen Engleman Conners
Member
Deborah A. P. Hersman
Member
Kathryn O’Leary Higgins
Member
Adopted: May 31, 2006
13 NTSB/PAB-06/01