# Pacific Gas and Electric Company Natural Gas Transmission Pipeline Rupture and Fire

- **operation:** document
- **citation:** DCA10MP008
- **title:** Pacific Gas and Electric Company Natural Gas Transmission Pipeline Rupture and Fire
- **source type:** incident
- **agency:** National Transportation Safety Board
- **status:** current
- **official:** true
- **published on:** 2020-11-24
- **effective on:** 2010-09-09
- **summary:** Accident. in San Bruno, CA, USA. on 2010-09-09. Pacific Gas and Electric Company. Rupture/fire
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/ntsb-case-dca10mp008.json
- **markdown:** https://regulus.evalyn.ai/document/ntsb-case-dca10mp008.md
- **app url:** https://regulus.evalyn.ai/document/ntsb-case-dca10mp008
- **source url:** https://www.ntsb.gov/investigations/Pages/DCA10MP008.aspx
**body:**

NTSB investigation DCA10MP008.

Event Type: Accident

Event Date: 2010-09-09

Event City: San Bruno

Event State Or Region: CA

Event Country: USA

Pipeline Operator: Pacific Gas and Electric Company

Accident Type: Rupture/fire

Completion Status: Completed

Report Number: PAR1101

Probable cause: The National Transportation Safety Board determines that the probable cause of the accident was the Pacific Gas and Electric Company's (PG&E) (1) inadequate quality assurance and quality control in 1956 during its Line 132 relocation project, which allowed the installation of a substandard and poorly welded pipe section with a visible seam weld flaw that, over time grew to a critical size, causing the pipeline to rupture during a pressure increase stemming from poorly planned electrical work at the Milpitas Terminal; and (2) inadequate pipeline integrity management program, which failed to detect and repair or remove the defective pipe section.

Tier1Name: System maintenance

Tier2Name: Inspection event

Tier1Name: System maintenance

Tier2Name: Miscellaneous/other

Tier1Name: Initiating product flow

Tier2Name: Inspection event

Tier1Name: System operating, changing flow/pressure

Tier2Name: Pressure/flow/temp event

Tier1Name: Post-release

Tier2Name: Explosion

Tier1Name: Post-release

Tier2Name: Fire (post-release)

Tier1Name: System shutdown

Tier2Name: Emergency shutoff

Tier1Name: System shutdown

Tier2Name: System warning/signal

Tier1Name: System shutdown

Tier2Name: Emergency response

Tier1Name: System shutdown

Tier2Name: Pipe structural malfunction/failure

Tier1Name: System shutdown

Tier2Name: Evacuation

Tier1Name: System shutdown

Tier2Name: Shutoff malfunction/failure

Tier1Name: System operating, changing flow/pressure

Tier2Name: System warning/signal

Tier1Name: System operating, changing flow/pressure

Tier2Name: Pressure/flow/temp event

Tier1Name: System operating, changing flow/pressure

Tier2Name: System/equipment malf/failure

Tier1Name: System not operating

Tier2Name: Fire/explosion (post-release)

Tier1Name: System operating, changing flow/pressure

Tier2Name: Product leak/release

Tier1Name: System maintenance

Tier2Name: Servicing event

Tier1Name: System not operating

Tier2Name: Inspection event

Finding Tier1Name: Organizational

Finding Tier2Name: Management

Finding Tier3Name: Policy/procedure

Finding Modifier Name: Pipeline operator

Finding Report Text: Organizational - Management - Policy/procedure - Pipeline operator

Finding Tier1Name: Organizational

Finding Tier2Name: Management

Finding Tier3Name: Policy/procedure

Finding Modifier Name: Pipeline operator

Finding Report Text: Organizational - Management - Policy/procedure - Pipeline operator

Finding Tier1Name: Organizational

Finding Tier2Name: Support/oversight/monitoring

Finding Tier3Name: Documentation/record keeping

Finding Modifier Name: Pipeline operator

Finding Report Text: Organizational - Support/oversight/monitoring - Documentation/record keeping - Pipeline operator

Finding Tier1Name: Organizational

Finding Tier2Name: Support/oversight/monitoring

Finding Tier3Name: Enforcement

Finding Modifier Name: Pipeline operator

Finding Report Text: Organizational - Support/oversight/monitoring - Enforcement - Pipeline operator

Finding Tier1Name: Organizational

Finding Tier2Name: Support/oversight/monitoring

Finding Tier3Name: Enforcement

Finding Modifier Name: Pipeline operator

Finding Report Text: Organizational - Support/oversight/monitoring - Enforcement - Pipeline operator

Finding Tier1Name: Organizational

Finding Tier2Name: Development

Finding Tier3Name: Selection/testing

Finding Modifier Name: Pipeline operator

Finding Report Text: Organizational - Development - Selection/testing - Pipeline operator

Finding Tier1Name: Organizational

Finding Tier2Name: Development

Finding Tier3Name: Design

Finding Modifier Name: Pipeline operator

Finding Report Text: Organizational - Development - Design - Pipeline operator

Finding Tier1Name: Organizational

Finding Tier2Name: Support/oversight/monitoring

Finding Tier3Name: Oversight

Finding Modifier Name: Pipeline operator

Finding Report Text: Organizational - Support/oversight/monitoring - Oversight - Pipeline operator

Finding Tier1Name: Organizational

Finding Tier2Name: Support/oversight/monitoring

Finding Tier3Name: Safety programs

Finding Modifier Name: Pipeline operator

Finding Report Text: Organizational - Support/oversight/monitoring - Safety programs - Pipeline operator

Finding Tier1Name: Organizational

Finding Tier2Name: Management

Finding Tier3Name: Culture

Finding Modifier Name: Pipeline operator

Finding Report Text: Organizational - Management - Culture - Pipeline operator

Finding Tier1Name: Organizational

Finding Tier2Name: Support/oversight/monitoring

Finding Tier3Name: Oversight

Finding Modifier Name: Federal agency

Finding Report Text: Organizational - Support/oversight/monitoring - Oversight - Federal agency

Finding Tier1Name: Organizational

Finding Tier2Name: Development

Finding Tier3Name: Selection/testing

Finding Modifier Name: Emergency services

Finding Report Text: Organizational - Development - Selection/testing - Emergency services

Finding Tier1Name: Organizational

Finding Tier2Name: Support/oversight/monitoring

Finding Tier3Name: Safety programs

Finding Modifier Name: Emergency services

Finding Report Text: Organizational - Support/oversight/monitoring - Safety programs - Emergency services

Finding Tier1Name: Organizational

Finding Tier2Name: Support/oversight/monitoring

Finding Tier3Name: Enforcement

Finding Modifier Name: Federal agency

Finding Report Text: Organizational - Support/oversight/monitoring - Enforcement - Federal agency

Finding Tier1Name: Organizational

Finding Tier2Name: Support/oversight/monitoring

Finding Tier3Name: Enforcement

Finding Modifier Name: State/Local agency

Finding Report Text: Organizational - Support/oversight/monitoring - Enforcement - State/Local agency

Finding Tier1Name: Organizational

Finding Tier2Name: Support/oversight/monitoring

Finding Tier3Name: Safety programs

Finding Modifier Name: State/Local agency

Finding Report Text: Organizational - Support/oversight/monitoring - Safety programs - State/Local agency

Finding Tier1Name: Organizational

Finding Tier2Name: Management

Finding Tier3Name: Resources

Finding Modifier Name: State/Local agency

Finding Report Text: Organizational - Management - Resources - State/Local agency

Finding Tier1Name: Organizational

Finding Tier2Name: Development

Finding Tier3Name: Manufacture/production

Finding Modifier Name: Other institution/organization

Finding Report Text: Organizational - Development - Manufacture/production - Other institution/organization

Finding Tier1Name: Organizational

Finding Tier2Name: Support/oversight/monitoring

Finding Tier3Name: Safety programs

Finding Modifier Name: State/Local agency

Finding Report Text: Organizational - Support/oversight/monitoring - Safety programs - State/Local agency

Finding Tier1Name: Organizational

Finding Tier2Name: Support/oversight/monitoring

Finding Tier3Name: Safety programs

Finding Modifier Name: State/Local agency

Finding Report Text: Organizational - Support/oversight/monitoring - Safety programs - State/Local agency

Finding Tier1Name: Organizational

Finding Tier2Name: Support/oversight/monitoring

Finding Tier3Name: Safety programs

Finding Modifier Name: Federal agency

Finding Report Text: Organizational - Support/oversight/monitoring - Safety programs - Federal agency

Finding Tier1Name: Organizational

Finding Tier2Name: Support/oversight/monitoring

Finding Tier3Name: Enforcement

Finding Modifier Name: State/Local agency

Finding Report Text: Organizational - Support/oversight/monitoring - Enforcement - State/Local agency

Finding Tier1Name: Organizational

Finding Tier2Name: Support/oversight/monitoring

Finding Tier3Name: Enforcement

Finding Modifier Name: Federal agency

Finding Report Text: Organizational - Support/oversight/monitoring - Enforcement - Federal agency

Finding Tier1Name: Pipeline

Finding Tier2Name: Pipeline structure

Finding Tier3Name: Joint/weld/seam

Finding Modifier Name: Related records

Finding Report Text: Pipeline - Pipeline structure - Joint/weld/seam - Related records

Finding Tier1Name: Pipeline

Finding Tier2Name: Pipeline structure

Finding Tier3Name: Pipe seam

Finding Modifier Name: Incorrect service/maintenance

Finding Report Text: Pipeline - Pipeline structure - Pipe seam - Incorrect service/maintenance

Finding Tier1Name: Pipeline

Finding Tier2Name: Pipeline structure

Finding Tier3Name: Joint/weld/seam

Finding Modifier Name: Related operating info

Finding Report Text: Pipeline - Pipeline structure - Joint/weld/seam - Related operating info

Finding Tier1Name: Personnel

Finding Tier2Name: Action/decision

Finding Tier3Name: Action

Finding Modifier Name: SCADA operations personnel

Finding Report Text: Personnel - Action/decision - Action - SCADA operations personnel

Finding Tier1Name: Personnel

Finding Tier2Name: Action/decision

Finding Tier3Name: Information processing/decision making

Finding Modifier Name: SCADA maintenance personnel

Finding Report Text: Personnel - Action/decision - Information processing/decision making - SCADA maintenance personnel

Finding Tier1Name: Environment/Infrastructure

Finding Tier2Name: Operating environment/control system

Finding Tier3Name: SCADA system

Finding Modifier Name: Availability of related info

Finding Report Text: Environment/Infrastructure - Operating environment/control system - SCADA system - Availability of related info

Finding Tier1Name: Pipeline

Finding Tier2Name: Pipeline operation/capability

Finding Tier3Name: Pipeline temp/pressure/flow parameter(s)

Finding Modifier Name: Design

Finding Report Text: Pipeline - Pipeline operation/capability - Pipeline temp/pressure/flow parameter(s) - Design

Finding Tier1Name: Pipeline

Finding Tier2Name: Pipeline operation/capability

Finding Tier3Name: Pipeline integrity/capacity

Finding Modifier Name: Related operating info

Finding Report Text: Pipeline - Pipeline operation/capability - Pipeline integrity/capacity - Related operating info

Finding Tier1Name: Personnel

Finding Tier2Name: Physical

Finding Tier3Name: Sensory ability/limitation

Finding Modifier Name: SCADA maintenance personnel

Finding Report Text: Personnel - Physical - Sensory ability/limitation - SCADA maintenance personnel

Finding Tier1Name: Personnel

Finding Tier2Name: Physical

Finding Tier3Name: Impairment/incapacitation

Finding Modifier Name: Federal government personnel

Finding Report Text: Personnel - Physical - Impairment/incapacitation - Federal government personnel

Finding Tier1Name: Personnel

Finding Tier2Name: Task performance

Finding Tier3Name: Planning/preparation

Finding Modifier Name: Not specified

Finding Report Text: Personnel - Task performance - Planning/preparation - Not specified

Finding Tier1Name: Pipeline

Finding Tier2Name: Pipeline structure

Finding Tier3Name: Pipe

Finding Modifier Name: Design

Finding Report Text: Pipeline - Pipeline structure - Pipe - Design

Official NTSB investigation data. NTSB findings determine probable cause and make safety recommendations; they do not adjudicate civil liability or regulatory violations.

What Happened
On September 9, 2010, about 6:11 p.m. Pacific daylight time, a 30-inch-diameter segment of an intrastate natural gas transmission pipeline known as Line 132, owned and operated by the Pacific Gas and Electric Company (PG&E), ruptured in a residential area in San Bruno, California. The rupture occurred at mile point 39.28 of Line 132, at the intersection of Earl Avenue and Glenview Drive. The rupture produced a crater about 72 feet long by 26 feet wide. The section of pipe that ruptured, which was about 28 feet long and weighed about 3,000 pounds, was found 100 feet south of the crater. PG&E estimated that 47.6 million standard cubic feet of natural gas was released. The released natural gas ignited, resulting in a fire that destroyed 38 homes and damaged 70. Eight people were killed, many were injured, and many more were evacuated from the area.

What We Found
The probable cause of the accident was the Pacific Gas and Electric Company’s (PG&E) (1) inadequate quality assurance and quality control in 1956 during its Line 132 relocation project, which allowed the installation of a substandard and poorly welded pipe section with a visible seam weld flaw that, over time grew to a critical size, causing the pipeline to rupture during a pressure increase stemming from poorly planned electrical work at the Milpitas Terminal; and (2) inadequate pipeline integrity management program, which failed to detect and repair or remove the defective pipe section.

Contributing to the accident were the California Public Utilities Commission’s (CPUC) and the U.S. Department of Transportation’s exemptions of existing pipelines from the regulatory requirement for pressure testing, which likely would have detected the installation defects. Also contributing to the accident was the CPUC’s failure to detect the inadequacies of PG&E’s pipeline integrity management program.

Contributing to the severity of the accident were the lack of either automatic shutoff valves or remote control valves on the line and PG&E’s flawed emergency response procedures and delay in isolating the rupture to stop the flow of gas.

What We Recommended
We made recommendations to the U.S. Secretary of Transportation, the Pipeline and Hazardous Materials Safety Administration, the Governor of the State of California, the California Public Utilities Commission, the Pacific Gas and Electric Company, the American Gas Association and the Interstate Natural Gas Association of America. Previously issued recommendations to the Pipeline and Hazardous Materials Safety Administration, the California Public Utilities Commission, the Pacific Gas and Electric Company.

PAR-11-01
<<<PAGE 1>>>

Pacific Gas and Electric Company
Natural Gas Transmission Pipeline Rupture and Fire
San Bruno, California
September 9, 2010
Accident Report
NTSB/PAR-11/01
PB2011-916501
National
Transportation
Safety Board

<<<PAGE 2>>>

NTSB/PAR-11/01
PB2011-916501
Notation 8275C
Adopted August 30, 2011
Pipeline Accident Report
Pacific Gas and Electric Company
Natural Gas Transmission Pipeline Rupture and Fire
San Bruno, California
September 9, 2010
National
Transportation
Safety Board
490 L’Enfant Plaza, S.W.
Washington, DC 20594

<<<PAGE 3>>>

National Transportation Safety Board. 2011. Pacific Gas and Electric Company Natural Gas
Transmission Pipeline Rupture and Fire, San Bruno, California, September 9, 2010. Pipeline
Accident Report NTSB/PAR-11/01. Washington, DC.
Abstract: On September 9, 2010, about 6:11 p.m. Pacific daylight time, a 30-inch-diameter segment of
an intrastate natural gas transmission pipeline known as Line 132, owned and operated by the Pacific Gas
and Electric Company, ruptured in a residential area in San Bruno, California. The rupture occurred at
mile point 39.28 of Line 132, at the intersection of Earl Avenue and Glenview Drive. The rupture
produced a crater about 72 feet long by 26 feet wide. The section of pipe that ruptured, which was about
28 feet long and weighed about 3,000 pounds, was found 100 feet south of the crater. The Pacific Gas and
Electric Company estimated that 47.6 million standard cubic feet of natural gas was released. The
released natural gas ignited, resulting in a fire that destroyed 38 homes and damaged 70. Eight people
were killed, many were injured, and many more were evacuated from the area.
As a result of its investigation of this accident, the National Transportation Safety Board makes
recommendations to the U.S. Secretary of Transportation, the Pipeline and Hazardous Materials Safety
Administration, the governor of the state of California, the California Public Utilities Commission, the
Pacific Gas and Electric Company, the American Gas Association, and the Interstate Natural Gas
Association of America.
The National Transportation Safety Board is an independent Federal agency dedicated to promoting aviation,
railroad, highway, marine, pipeline, and hazardous materials safety. Established in 1967, the agency is mandated by
Congress through the Independent Safety Board Act of 1974 to investigate transportation accidents, determine the
probable causes of the accidents, issue safety recommendations, study transportation safety issues, and evaluate the
safety effectiveness of government agencies involved in transportation. The Safety Board makes public its actions
and decisions through accident reports, safety studies, special investigation reports, safety recommendations, and
statistical reviews.
Recent publications are available in their entirety on the Internet at <http://www.ntsb.gov>. Other information about
available publications also may be obtained from the website or by contacting:
National Transportation Safety Board
Records Management Division, CIO-40
490 L’Enfant Plaza, SW
Washington, DC 20594
(800) 877-6799 or (202) 314-6551
Safety Board publications may be purchased, by individual copy or by subscription, from the National Technical
Information Service. To purchase this publication, order report number PB2011-916501 from:
National Technical Information Service
5301 Shawnee Road
Alexandria, Virginia 22312
(800) 553-6847 or (703) 605-6000
The Independent Safety Board Act, as codified at 49 U.S.C. Section 1154(b), precludes the admission into evidence
or use of Board reports related to an incident or accident in a civil action for damages resulting from a matter
mentioned in the report.

<<<PAGE 4>>>

NTSB Pipeline Accident Report
Contents
Figures ........................................................................................................................................... vi
Tables ........................................................................................................................................... vii
Acronyms and Abbreviations ................................................................................................... viii
Executive Summary .......................................................................................................................x
Investigation Synopsis .....................................................................................................................x
Probable Cause.............................................................................................................................. xii
Recommendations ......................................................................................................................... xii
1. Factual Information ...................................................................................................................1
1.1 Accident Narrative .....................................................................................................................1
1.1.1 Preaccident Events ...........................................................................................................3
1.1.2 Events Leading Up to Rupture ........................................................................................5
1.1.3 The Rupture ...................................................................................................................12
1.2 Emergency Response ...............................................................................................................12
1.3 Injuries .....................................................................................................................................18
1.4 Damage ....................................................................................................................................18
1.5 Meteorological Information .....................................................................................................21
1.6 Personnel Information ..............................................................................................................21
1.6.1 Milpitas Technician and Other Workers at the Milpitas Terminal ................................21
1.6.2 SCADA Operators .........................................................................................................22
1.7 Pipeline Information ................................................................................................................23
1.7.1 Line 132 .........................................................................................................................23
1.7.2 1956 Relocation Project (Segment 180) ........................................................................25
1.7.3 Multiyear Replacement Project and Seismic Risk .........................................................29
1.7.4 Underground Environment at Accident Location ..........................................................30
1.7.4.1 2008 Sewer Replacement .................................................................................30
1.7.4.2 Guidelines for Pipe Bursting ............................................................................33
1.7.4.3 Pipe Bursting Study .........................................................................................33
1.7.5 Pipeline MAOP ..............................................................................................................33
1.7.5.1 “Grandfather Clause” .......................................................................................34
1.7.5.2 MAOP for Line 132 .........................................................................................35
1.7.5.3 Periodic Pressure Increases to MAOP .............................................................36
1.7.6 History of Seam Defects in PG&E Gas Transmission Pipelines ...................................38
1.7.7 Protection Against Accidental Overpressure .................................................................39
1.8 Examination of Accident Pipe .................................................................................................39
1.8.1 Welds .............................................................................................................................41
1.8.2 Crack Initiation ..............................................................................................................43
1.8.3 Material Properties .........................................................................................................46
1.8.4 Historical Information About Steel Grades ...................................................................47
1.8.5 Burst Pressure Study and Finite Element Modeling ......................................................48
iii

<<<PAGE 5>>>

NTSB Pipeline Accident Report
1.9 Pipeline Operations and Management .....................................................................................51
1.9.1 SCADA System Operations ..........................................................................................51
1.9.1.1 Milpitas Terminal.............................................................................................52
1.9.1.2 Work Clearance Procedures .............................................................................54
1.9.1.3 Emergency Response Procedures ....................................................................55
1.9.2 Use of Automatic Shutoff Valves and Remote Control Valves ....................................56
1.9.3 Public Awareness ...........................................................................................................57
1.9.4 PG&E Risk Management/Integrity Management Program ...........................................59
1.9.4.1 Geographic Information System ......................................................................59
1.9.4.2 Risk Management Procedures..........................................................................61
1.9.4.3 Threats Identified for Line 132 ........................................................................65
1.10 Oversight ................................................................................................................................67
1.10.1 State Oversight by CPUC ............................................................................................67
1.10.2 Federal Oversight by PHMSA .....................................................................................69
1.11 Postaccident Actions ..............................................................................................................71
1.11.1 Actions Taken by PG&E .............................................................................................71
1.11.2 Actions Taken by CPUC .............................................................................................72
1.11.3 Actions Taken by PHMSA ..........................................................................................74
1.11.4 Actions Taken by Congress .........................................................................................74
1.12 Previous NTSB Safety Recommendations ............................................................................75
1.12.1 January 3, 2011, Safety Recommendations to PG&E, CPUC, and
PHMSA Regarding Record-keeping and Hydrostatic Pressure Testing ................................75
1.12.2 June 8, 2011, Safety Recommendations to PHMSA and PG&E
Concerning Emergency Response ..........................................................................................77
1.12.3 Other Relevant Recommendations ..............................................................................78
1.12.3.1 Grandfathering of Higher Permissible Stress Levels for Pre-
1970 Pipelines ..............................................................................................................78
1.12.3.2 Constructing and Modifying Pipelines to Accommodate Use
of In-Line Inspection Equipment .................................................................................79
1.12.3.3 Rapid Shutdown and ASVs and RCVs ..........................................................80
1.13 Other Information ..................................................................................................................81
1.13.1 Pipeline Assessment Methods for Integrity Management ...........................................81
1.13.1.1 Pressure Testing .............................................................................................82
1.13.1.2 In-line Inspection ...........................................................................................83
1.13.1.3 Direct Assessment ..........................................................................................85
1.13.2 Automatic Shutoff Valve Technology .........................................................................86
1.13.3 2008 Natural Gas Explosion in Rancho Cordova, California ......................................87
2. Analysis .....................................................................................................................................88
2.1 Introduction ..............................................................................................................................88
2.2 Preaccident Events ...................................................................................................................90
2.2.1 Work Clearance Procedures for Electrical Work at Milpitas Terminal ........................90
2.2.2 Internal Line Pressure Prior to Failure ...........................................................................91
2.3 Cause of Pipeline Rupture .......................................................................................................92
2.3.1 Fracture Origin and Failure ...........................................................................................93
2.3.2 Deficiencies in Fabrication of Accident Pipe Segment .................................................94
iv

<<<PAGE 6>>>

NTSB Pipeline Accident Report
2.3.3 Deficiencies in Quality Control Associated with 1956 Relocation
Project .....................................................................................................................................95
2.3.4 2008 Sewer Pipe Bursting Operation ............................................................................96
2.4 Adequacy of PG&E Emergency Response ..............................................................................97
2.4.1 Internal Communication and Coordination ...................................................................98
2.4.2 Notifying Emergency Responders ...............................................................................100
2.4.3 Line Break Recognition ...............................................................................................101
2.4.4 Rapid Shutdown, ASVs, and RCVs ............................................................................102
2.4.5 Deficiencies in Postaccident Drug and Alcohol Testing .............................................104
2.5 MAOP ....................................................................................................................................106
2.5.1 MAOP of Line 132 ......................................................................................................106
2.5.2 Grandfathering of Pre-1970 Pipelines .........................................................................106
2.6 Integrity Management Program .............................................................................................107
2.6.1 PG&E GIS and Pipeline Record-keeping ....................................................................108
2.6.2 Threat Identification and Risk Assessment .................................................................110
2.6.2.1 Weighting of Threats .....................................................................................110
2.6.2.2 Identification and Assessment of Design/Material and
Construction Threats on Line 132..............................................................................110
2.6.2.3 Regulatory Assumption of Stable Manufacturing- and
Construction-Related Defects .....................................................................................112
2.6.3 Self-Assessment of Program Effectiveness .................................................................113
2.6.4 Summary of PG&E Integrity Management Practices ..................................................114
2.7 Adequacy of PG&E’s Public Awareness Program Evaluation..............................................115
2.8 Summary of PG&E Practices.................................................................................................116
2.9 Inspection Technology ...........................................................................................................118
2.10 Oversight ..............................................................................................................................119
2.10.1 Performance-Based Safety Programs ........................................................................119
2.10.2 Authority and Enforcement .......................................................................................122
3. Conclusions .............................................................................................................................124
3.1 Findings..................................................................................................................................124
3.2 Probable Cause.......................................................................................................................127
4. Recommendations ..................................................................................................................128
4.1 New Recommendations .........................................................................................................128
4.2 Previously Issued Recommendations ....................................................................................132
4.3 Previously Issued Recommendations Classified in This Report ...........................................134
5. Appendix .................................................................................................................................140
v

<<<PAGE 7>>>

NTSB Pipeline Accident Report
Figures
Figure 1. Picture of crater and ruptured pipeline. .......................................................................... 2
Figure 2. Picture of ejected pipe section. ....................................................................................... 2
Figure 3. Aerial view of fire........................................................................................................... 3
Figure 4. Overview of Line 132. .................................................................................................... 4
Figure 5. Picture of local control panel. ......................................................................................... 6
Figure 6a. Normal electrical configuration at the Milpitas Terminal. ........................................... 7
Figure 6b. Temporary electrical configuration at the Milpitas Terminal preceding
the accident. .................................................................................................................................... 8
Figure 7. Schematic showing regulating valve control. ................................................................. 8
Figure 8a. Valve configuration at the Milpitas Terminal prior to 5:22 p.m. ............................... 10
Figure 8b. Valve configuration at the Milpitas Terminal about 5:25 p.m. .................................. 11
Figure 9. Firefighters approaching accident scene. ...................................................................... 13
Figure 10. Location of valve closures. ......................................................................................... 17
Figure 11. Picture showing area of damage from blast and fire. ................................................. 19
Figure 12. Picture of destroyed houses. ....................................................................................... 20
Figure 13. Picture of a burned car in front of several destroyed houses. ..................................... 20
Figure 14. Map showing PG&E peninsula gas transmission lines. ............................................. 24
Figure 15. Line 132 installation, relocations, and replacements. ................................................. 26
Figure 16. Sketch of underground utilities environment. ............................................................ 30
Figure 17. Diagram of excavations relative to Segment 180. ...................................................... 32
Figure 18. Schematic of accident pipe. ........................................................................................ 40
Figure 19a. Picture showing cross section of longitudinal seam in pup 1. .................................. 42
Figure 19b. Picture showing cross section of longitudinal seam in typical DSAW
pipe. ............................................................................................................................................... 42
Figure 20. Picture of pipe section with white arrows showing direction of crack
propagation. .................................................................................................................................. 44
Figure 21. Pictures highlighting rupture initiation site in pup 1 longitudinal seam. .................... 45
Figure 22a. Stress contours at an internal pressure of 375 psig for the finite
element model of the weld geometry similar to pup 1. Contour values are the
same as in figure 22b. ................................................................................................................... 50
Figure 22b. Stress contours at an internal pressure of 375 psig for the finite
element model of a DSAW seam. Contour values are the same as in figure 22a. ........................ 50
Figure 23. Flowchart of PG&E’s emergency response procedures. ............................................ 55
vi

<<<PAGE 8>>>

NTSB Pipeline Accident Report
Tables
Table 1. Injuries............................................................................................................................ 18
Table 2. PG&E gas transmission pipeline seam leaks or test failures, 1948–2011. .................... 39
Table 3. Average and standard deviation of mechanical test data for all lengths of
pipe. ............................................................................................................................................... 46
Table 4. Minimum yield strength, tensile strength, and elongation requirements
according to PG&E and API pipe specifications. ......................................................................... 47
Table 5. Incoming and outgoing lines at Milpitas Terminal. ....................................................... 53
Table 6. Survey postcard responses to public awareness brochures. ........................................... 59
Table 7. PG&E’s reportable events by cause for 2004–2010. ..................................................... 65
Table 8. Line 132 risk values. ...................................................................................................... 66
vii

<<<PAGE 9>>>

NTSB Pipeline Accident Report
Acronyms and Abbreviations
AGA American Gas Association
ANPRM advance notice of proposed rulemaking
API American Petroleum Institute
ASME American Society of Mechanical Engineers
ASOS Automated Surface Observing System
ASTM American Society for Testing and Materials
ASV automatic shutoff valve
CFR Code of Federal Regulations
COF consequence of failure
Consolidated Western Consolidated Western Steel Corporation
CPUC California Public Utilities Commission
DOT U.S. Department of Transportation
DSAW double submerged arc welded
ECDA external corrosion direct assessment
ERW electric resistance welded
GIS geographic information system
GRI Gas Research Institute
GSR gas service representative
GTI Gas Technology Institute
HCA high consequence area
HV Vickers hardness number
INGAA Interstate Natural Gas Association of America
KSFO San Francisco International Airport
viii

<<<PAGE 10>>>

NTSB Pipeline Accident Report
ksi 1,000 pounds per square inch
LOF likelihood of failure
MAOP maximum allowable operating pressure
MOP maximum operating pressure
MP mile point
NPRM notice of proposed rulemaking
NTSB National Transportation Safety Board
PAPERS Public Awareness Program Effectiveness Research Survey
PG&E Pacific Gas and Electric Company
PHMSA Pipeline and Hazardous Materials Safety Administration
PLC programmable logic controller
psi pounds per square inch
psig pounds per square inch, gauge
RCV remote control valve
RMP risk management procedure
RSPA Research and Special Programs Administration
SBFD San Bruno Fire Department
SCADA supervisory control and data acquisition
SMLS seamless
SMYS specified minimum yield strength
the Corps U.S. Army Corps of Engineers
UPS uninterruptible power supply
ix

<<<PAGE 11>>>

NTSB Pipeline Accident Report
Executive Summary
On September 9, 2010, about 6:11 p.m. Pacific daylight time, a 30-inch-diameter
segment of an intrastate natural gas transmission pipeline known as Line 132, owned and
operated by the Pacific Gas and Electric Company (PG&E), ruptured in a residential area in
San Bruno, California. The rupture occurred at mile point 39.28 of Line 132, at the intersection
of Earl Avenue and Glenview Drive. The rupture produced a crater about 72 feet long by 26 feet
wide. The section of pipe that ruptured, whic
- **truncated:** true
- **body characters:** 418846