# PIPELINE OPERATIONS & INTEGRITY MANAGEMENT ATTACHMENT #40 - INTERVIEW OF STATION OPERATOR WITH ERRATA

- **operation:** document
- **citation:** PLD19FR002 docket item 61
- **title:** PIPELINE OPERATIONS & INTEGRITY MANAGEMENT ATTACHMENT #40 - INTERVIEW OF STATION OPERATOR WITH ERRATA
- **source type:** incident
- **agency:** National Transportation Safety Board
- **status:** current
- **official:** true
- **published on:** Not available
- **effective on:** Not available
- **summary:** PLD19FR002; docket item 61; Text/Image.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/ntsb-docket-item-11790221.json
- **markdown:** https://regulus.evalyn.ai/document/ntsb-docket-item-11790221.md
- **app url:** https://regulus.evalyn.ai/document/ntsb-docket-item-11790221
- **source url:** https://data.ntsb.gov/Docket/Document/docBLOB?ID=11790221&FileExtension=pdf&FileName=%2340%20-%20Interview%20of%20Station%20Operator%20with%20Errata_Redacted-Rel.pdf
**body:**

PIPELINE OPERATIONS & INTEGRITY MANAGEMENT ATTACHMENT #40 - INTERVIEW OF STATION OPERATOR WITH ERRATA PLD19FR002 docket item 61. 36 pages. 0 photograph references. Published media type: Text/Image. Metadata only; the linked docket file is not mirrored.
- **truncated:** false
- **body characters:** 252
