# PIPELINE OPERATIONS & INTEGRITY MANAGEMENT ATTACHMENT #12 - HYDROTEST RESPONSES

- **operation:** document
- **citation:** PLD19FR002 docket item 34
- **title:** PIPELINE OPERATIONS & INTEGRITY MANAGEMENT ATTACHMENT #12 - HYDROTEST RESPONSES
- **source type:** incident
- **agency:** National Transportation Safety Board
- **status:** current
- **official:** true
- **published on:** Not available
- **effective on:** Not available
- **summary:** PLD19FR002; docket item 34; Text/Image.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/ntsb-docket-item-11904969.json
- **markdown:** https://regulus.evalyn.ai/document/ntsb-docket-item-11904969.md
- **app url:** https://regulus.evalyn.ai/document/ntsb-docket-item-11904969
- **source url:** https://data.ntsb.gov/Docket/Document/docBLOB?ID=11904969&FileExtension=pdf&FileName=%2312%20-%20DR146A%20Narrative%20Responses%20for%20NTSB%20DR%20139-145-c2-Rel.pdf
**body:**

PIPELINE OPERATIONS & INTEGRITY MANAGEMENT ATTACHMENT #12 - HYDROTEST RESPONSES PLD19FR002 docket item 34. 3 pages. 0 photograph references. Published media type: Text/Image. Metadata only; the linked docket file is not mirrored.
- **truncated:** false
- **body characters:** 229
