# PIPELINE OPERATIONS & INTEGRITY MANAGEMENT ATTACHMENT #33 - OWINGSVILLE LINE 15 HARD SPOT ASSESSMENT PLAN

- **operation:** document
- **citation:** PLD19FR002 docket item 55
- **title:** PIPELINE OPERATIONS & INTEGRITY MANAGEMENT ATTACHMENT #33 - OWINGSVILLE LINE 15 HARD SPOT ASSESSMENT PLAN
- **source type:** incident
- **agency:** National Transportation Safety Board
- **status:** current
- **official:** true
- **published on:** Not available
- **effective on:** Not available
- **summary:** PLD19FR002; docket item 55; Text/Image.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/ntsb-docket-item-11941965.json
- **markdown:** https://regulus.evalyn.ai/document/ntsb-docket-item-11941965.md
- **app url:** https://regulus.evalyn.ai/document/ntsb-docket-item-11941965
- **source url:** https://data.ntsb.gov/Docket/Document/docBLOB?ID=11941965&FileExtension=pdf&FileName=%2333%20-%20DR97%20Hard%20Spot%20Assessment%20Plan%206-28-2004-c2-Rel.pdf
**body:**

PIPELINE OPERATIONS & INTEGRITY MANAGEMENT ATTACHMENT #33 - OWINGSVILLE LINE 15 HARD SPOT ASSESSMENT PLAN PLD19FR002 docket item 55. 7 pages. 0 photograph references. Published media type: Text/Image. Metadata only; the linked docket file is not mirrored.
- **truncated:** false
- **body characters:** 255
