# PIPELINE OPERATIONS & INTEGRITY MANAGEMENT ATTACHMENT #51 - GAS CONTROL CENTER STAFFING

- **operation:** document
- **citation:** PLD19FR002 docket item 72
- **title:** PIPELINE OPERATIONS & INTEGRITY MANAGEMENT ATTACHMENT #51 - GAS CONTROL CENTER STAFFING
- **source type:** incident
- **agency:** National Transportation Safety Board
- **status:** current
- **official:** true
- **published on:** Not available
- **effective on:** Not available
- **summary:** PLD19FR002; docket item 72; Text/Image.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/ntsb-docket-item-11945321.json
- **markdown:** https://regulus.evalyn.ai/document/ntsb-docket-item-11945321.md
- **app url:** https://regulus.evalyn.ai/document/ntsb-docket-item-11945321
- **source url:** https://data.ntsb.gov/Docket/Document/docBLOB?ID=11945321&FileExtension=pdf&FileName=%2351%20-%20Staffing%20Levels%20Email_Redacted-Rel.pdf
**body:**

PIPELINE OPERATIONS & INTEGRITY MANAGEMENT ATTACHMENT #51 - GAS CONTROL CENTER STAFFING PLD19FR002 docket item 72. 1 page. 0 photograph references. Published media type: Text/Image. Metadata only; the linked docket file is not mirrored.
- **truncated:** false
- **body characters:** 236
