# PIPELINE OPERATIONS & INTEGRITY MANAGEMENT ATTACHMENT #52 - CONTROL ROOM ALARM MANAGEMENT PLAN - EXCERPTS

- **operation:** document
- **citation:** PLD19FR002 docket item 73
- **title:** PIPELINE OPERATIONS & INTEGRITY MANAGEMENT ATTACHMENT #52 - CONTROL ROOM ALARM MANAGEMENT PLAN - EXCERPTS
- **source type:** incident
- **agency:** National Transportation Safety Board
- **status:** current
- **official:** true
- **published on:** Not available
- **effective on:** Not available
- **summary:** PLD19FR002; docket item 73; Text/Image.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/ntsb-docket-item-11945613.json
- **markdown:** https://regulus.evalyn.ai/document/ntsb-docket-item-11945613.md
- **app url:** https://regulus.evalyn.ai/document/ntsb-docket-item-11945613
- **source url:** https://data.ntsb.gov/Docket/Document/docBLOB?ID=11945613&FileExtension=pdf&FileName=%2352%20-%20DR148A%20CRM_Alarm_Management_Plan_USGasCtrl_2018-Rel.pdf
**body:**

PIPELINE OPERATIONS & INTEGRITY MANAGEMENT ATTACHMENT #52 - CONTROL ROOM ALARM MANAGEMENT PLAN - EXCERPTS PLD19FR002 docket item 73. 16 pages. 0 photograph references. Published media type: Text/Image. Metadata only; the linked docket file is not mirrored.
- **truncated:** false
- **body characters:** 256
