# PIPELINE OPERATIONS & INTEGRITY MANAGEMENT ATTACHMENT #75 - ILI RE-INSPECTION INTERVAL DETERMINATION

- **operation:** document
- **citation:** PLD19FR002 docket item 95
- **title:** PIPELINE OPERATIONS & INTEGRITY MANAGEMENT ATTACHMENT #75 - ILI RE-INSPECTION INTERVAL DETERMINATION
- **source type:** incident
- **agency:** National Transportation Safety Board
- **status:** current
- **official:** true
- **published on:** Not available
- **effective on:** Not available
- **summary:** PLD19FR002; docket item 95; Text/Image.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/ntsb-docket-item-11948786.json
- **markdown:** https://regulus.evalyn.ai/document/ntsb-docket-item-11948786.md
- **app url:** https://regulus.evalyn.ai/document/ntsb-docket-item-11948786
- **source url:** https://data.ntsb.gov/Docket/Document/docBLOB?ID=11948786&FileExtension=pdf&FileName=%2375%20-%20DR124D%20Attachment%2003%20-%202011%2030IN%20Line%2015%20-%20Tompkinsville%20-%20Danville%207T-288-c2-Rel.pdf
**body:**

PIPELINE OPERATIONS & INTEGRITY MANAGEMENT ATTACHMENT #75 - ILI RE-INSPECTION INTERVAL DETERMINATION PLD19FR002 docket item 95. 1 page. 0 photograph references. Published media type: Text/Image. Metadata only; the linked docket file is not mirrored.
- **truncated:** false
- **body characters:** 249
