# PIPELINE OPERATIONS & INTEGRITY MANAGEMENT ATTACHMENT #80 - IN-LINE INSPECTION COMPLETION RECORD FOR 2018 MFL-CALIPER ILI

- **operation:** document
- **citation:** PLD19FR002 docket item 99
- **title:** PIPELINE OPERATIONS & INTEGRITY MANAGEMENT ATTACHMENT #80 - IN-LINE INSPECTION COMPLETION RECORD FOR 2018 MFL-CALIPER ILI
- **source type:** incident
- **agency:** National Transportation Safety Board
- **status:** current
- **official:** true
- **published on:** Not available
- **effective on:** Not available
- **summary:** PLD19FR002; docket item 99; Text/Image.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/ntsb-docket-item-11949090.json
- **markdown:** https://regulus.evalyn.ai/document/ntsb-docket-item-11949090.md
- **app url:** https://regulus.evalyn.ai/document/ntsb-docket-item-11949090
- **source url:** https://data.ntsb.gov/Docket/Document/docBLOB?ID=11949090&FileExtension=pdf&FileName=%2380%20-%20DR124E%20Attachment%2004%20-%202018%2030IN%20Line%2015%20-%20Tompkinsville%20-%20Danville%20ILI%20Completion-c2_Redacted-Rel.pdf
**body:**

PIPELINE OPERATIONS & INTEGRITY MANAGEMENT ATTACHMENT #80 - IN-LINE INSPECTION COMPLETION RECORD FOR 2018 MFL-CALIPER ILI PLD19FR002 docket item 99. 6 pages. 0 photograph references. Published media type: Text/Image. Metadata only; the linked docket file is not mirrored.
- **truncated:** false
- **body characters:** 271
