# PIPELINE OPERATIONS & INTEGRITY MANAGEMENT ATTACHMENT #84 - 2018 CLOSE INTERVAL SURVEY

- **operation:** document
- **citation:** PLD19FR002 docket item 103
- **title:** PIPELINE OPERATIONS & INTEGRITY MANAGEMENT ATTACHMENT #84 - 2018 CLOSE INTERVAL SURVEY
- **source type:** incident
- **agency:** National Transportation Safety Board
- **status:** current
- **official:** true
- **published on:** Not available
- **effective on:** Not available
- **summary:** PLD19FR002; docket item 103; Text/Image.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/ntsb-docket-item-11949161.json
- **markdown:** https://regulus.evalyn.ai/document/ntsb-docket-item-11949161.md
- **app url:** https://regulus.evalyn.ai/document/ntsb-docket-item-11949161
- **source url:** https://data.ntsb.gov/Docket/Document/docBLOB?ID=11949161&FileExtension=pdf&FileName=%2384%20-%20DR14%20PLD19FR002%20TOMP-DANV%20L15%20VS-03_04%20FINAL%20REPORT-c2_Redacted-Rel.pdf
**body:**

PIPELINE OPERATIONS & INTEGRITY MANAGEMENT ATTACHMENT #84 - 2018 CLOSE INTERVAL SURVEY PLD19FR002 docket item 103. 311 pages. 0 photograph references. Published media type: Text/Image. Metadata only; the linked docket file is not mirrored.
- **truncated:** false
- **body characters:** 239
