# PIPELINE OPERATIONS & INTEGRITY MANAGEMENT ATTACHMENT #100 - NDT RE-ANALYSIS - INSPECTION REPORT - 2019 POST-ACCIDENT

- **operation:** document
- **citation:** PLD19FR002 docket item 117
- **title:** PIPELINE OPERATIONS & INTEGRITY MANAGEMENT ATTACHMENT #100 - NDT RE-ANALYSIS - INSPECTION REPORT - 2019 POST-ACCIDENT
- **source type:** incident
- **agency:** National Transportation Safety Board
- **status:** current
- **official:** true
- **published on:** Not available
- **effective on:** Not available
- **summary:** PLD19FR002; docket item 117; Text/Image.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/ntsb-docket-item-11950654.json
- **markdown:** https://regulus.evalyn.ai/document/ntsb-docket-item-11950654.md
- **app url:** https://regulus.evalyn.ai/document/ntsb-docket-item-11950654
- **source url:** https://data.ntsb.gov/Docket/Document/docBLOB?ID=11950654&FileExtension=pdf&FileName=100%20-%20DR100%20combined%20pdf%20files_Redacted-Rel.pdf
**body:**

PIPELINE OPERATIONS & INTEGRITY MANAGEMENT ATTACHMENT #100 - NDT RE-ANALYSIS - INSPECTION REPORT - 2019 POST-ACCIDENT PLD19FR002 docket item 117. 16 pages. 0 photograph references. Published media type: Text/Image. Metadata only; the linked docket file is not mirrored.
- **truncated:** false
- **body characters:** 269
