# PIPELINE OPERATIONS & INTEGRITY MANAGEMENT ATTACHMENT #22 - RECTIFIER AND TEST STATION READINGS FOR LINE 15

- **operation:** document
- **citation:** PLD19FR002 docket item 44
- **title:** PIPELINE OPERATIONS & INTEGRITY MANAGEMENT ATTACHMENT #22 - RECTIFIER AND TEST STATION READINGS FOR LINE 15
- **source type:** incident
- **agency:** National Transportation Safety Board
- **status:** current
- **official:** true
- **published on:** Not available
- **effective on:** Not available
- **summary:** PLD19FR002; docket item 44; Text/Image.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/ntsb-docket-item-11957128.json
- **markdown:** https://regulus.evalyn.ai/document/ntsb-docket-item-11957128.md
- **app url:** https://regulus.evalyn.ai/document/ntsb-docket-item-11957128
- **source url:** https://data.ntsb.gov/Docket/Document/docBLOB?ID=11957128&FileExtension=pdf&FileName=%2322%20-%20DR10%20combined%20files%20rectifier%20and%20test%20station%20readings%20Line%2015%20-%202015%20through%202019_Redacted-Rel.pdf
**body:**

PIPELINE OPERATIONS & INTEGRITY MANAGEMENT ATTACHMENT #22 - RECTIFIER AND TEST STATION READINGS FOR LINE 15 PLD19FR002 docket item 44. 45 pages. 0 photograph references. Published media type: Text/Image. Metadata only; the linked docket file is not mirrored.
- **truncated:** false
- **body characters:** 258
