# OPERATIONS - INTEGRITY MANAGEMENT ATTACHMENT #5 - PIPELINE SPECIFICATIONS

- **operation:** document
- **citation:** PLD21FR003 docket item 21
- **title:** OPERATIONS - INTEGRITY MANAGEMENT ATTACHMENT #5 - PIPELINE SPECIFICATIONS
- **source type:** incident
- **agency:** National Transportation Safety Board
- **status:** current
- **official:** true
- **published on:** Not available
- **effective on:** Not available
- **summary:** PLD21FR003; docket item 21; Text/Image.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/ntsb-docket-item-14217821.json
- **markdown:** https://regulus.evalyn.ai/document/ntsb-docket-item-14217821.md
- **app url:** https://regulus.evalyn.ai/document/ntsb-docket-item-14217821
- **source url:** https://data.ntsb.gov/Docket/Document/docBLOB?ID=14217821&FileExtension=pdf&FileName=Ops-IM%2005%20-%20Pipeline%20Specifications_redacted-Rel.pdf
**body:**

OPERATIONS - INTEGRITY MANAGEMENT ATTACHMENT #5 - PIPELINE SPECIFICATIONS PLD21FR003 docket item 21. 1 page. 0 photograph references. Published media type: Text/Image. Metadata only; the linked docket file is not mirrored.
- **truncated:** false
- **body characters:** 222
