# A2 - PIPELINE OPERATIONS - FACILITY DAMAGE REPORTING AND INVESTIGATION 8/2/2022 - UGI

- **operation:** document
- **citation:** PLD23LR002 docket item 29
- **title:** A2 - PIPELINE OPERATIONS - FACILITY DAMAGE REPORTING AND INVESTIGATION 8/2/2022 - UGI
- **source type:** incident
- **agency:** National Transportation Safety Board
- **status:** current
- **official:** true
- **published on:** Not available
- **effective on:** Not available
- **summary:** PLD23LR002; docket item 29; Text/Image.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/ntsb-docket-item-16498654.json
- **markdown:** https://regulus.evalyn.ai/document/ntsb-docket-item-16498654.md
- **app url:** https://regulus.evalyn.ai/document/ntsb-docket-item-16498654
- **source url:** https://data.ntsb.gov/Docket/Document/docBLOB?ID=16498654&FileExtension=pdf&FileName=GOM_60.40.50-Rel.pdf
**body:**

A2 - PIPELINE OPERATIONS - FACILITY DAMAGE REPORTING AND INVESTIGATION 8/2/2022 - UGI PLD23LR002 docket item 29. 11 pages. 0 photograph references. Published media type: Text/Image. Metadata only; the linked docket file is not mirrored.
- **truncated:** false
- **body characters:** 236
