# 3 - EMERGENCY RESPONSE - UGI VALVE MAINTENANCE PROCEDURE - JANUARY 2022

- **operation:** document
- **citation:** PLD23LR002 docket item 66
- **title:** 3 - EMERGENCY RESPONSE - UGI VALVE MAINTENANCE PROCEDURE - JANUARY 2022
- **source type:** incident
- **agency:** National Transportation Safety Board
- **status:** current
- **official:** true
- **published on:** Not available
- **effective on:** Not available
- **summary:** PLD23LR002; docket item 66; Text/Image.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/ntsb-docket-item-17720639.json
- **markdown:** https://regulus.evalyn.ai/document/ntsb-docket-item-17720639.md
- **app url:** https://regulus.evalyn.ai/document/ntsb-docket-item-17720639
- **source url:** https://data.ntsb.gov/Docket/Document/docBLOB?ID=17720639&FileExtension=pdf&FileName=3%20%E2%80%93%20Emergency%20Response%20%E2%80%93%20UGI%20Valve%20maintenance%20procedure-Rel.pdf
**body:**

3 - EMERGENCY RESPONSE - UGI VALVE MAINTENANCE PROCEDURE - JANUARY 2022 PLD23LR002 docket item 66. 6 pages. 0 photograph references. Published media type: Text/Image. Metadata only; the linked docket file is not mirrored.
- **truncated:** false
- **body characters:** 221
