# 2 - PIPELINE OPERATIONS - EMAIL FROM AGA DIRECTOR, ENERGY STANDARDS TO NTSB ON 9.24.2024

- **operation:** document
- **citation:** PLD24FR003 docket item 64
- **title:** 2 - PIPELINE OPERATIONS - EMAIL FROM AGA DIRECTOR, ENERGY STANDARDS TO NTSB ON 9.24.2024
- **source type:** incident
- **agency:** National Transportation Safety Board
- **status:** current
- **official:** true
- **published on:** Not available
- **effective on:** Not available
- **summary:** PLD24FR003; docket item 64; Text/Image.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/ntsb-docket-item-17974593.json
- **markdown:** https://regulus.evalyn.ai/document/ntsb-docket-item-17974593.md
- **app url:** https://regulus.evalyn.ai/document/ntsb-docket-item-17974593
- **source url:** https://data.ntsb.gov/Docket/Document/docBLOB?ID=17974593&FileExtension=pdf&FileName=Email%20from%20AGA%20Director,%20Energy%20Standards%20to%20NTSB%20on%209.24.2024_Redacted-Rel.pdf
**body:**

2 - PIPELINE OPERATIONS - EMAIL FROM AGA DIRECTOR, ENERGY STANDARDS TO NTSB ON 9.24.2024 PLD24FR003 docket item 64. 6 pages. 0 photograph references. Published media type: Text/Image. Metadata only; the linked docket file is not mirrored.
- **truncated:** false
- **body characters:** 238
