# 3 - PIPELINE OPERATIONS - MAIN INSTALLATION CARD 8-31-1960

- **operation:** document
- **citation:** PLD25FR002 docket item 14
- **title:** 3 - PIPELINE OPERATIONS - MAIN INSTALLATION CARD 8-31-1960
- **source type:** incident
- **agency:** National Transportation Safety Board
- **status:** current
- **official:** true
- **published on:** Not available
- **effective on:** Not available
- **summary:** PLD25FR002; docket item 14; Other.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/ntsb-docket-item-19142922.json
- **markdown:** https://regulus.evalyn.ai/document/ntsb-docket-item-19142922.md
- **app url:** https://regulus.evalyn.ai/document/ntsb-docket-item-19142922
- **source url:** https://data.ntsb.gov/Docket/Document/docBLOB?ID=19142922&FileExtension=pdf&FileName=Main%20Installation%20Card%208-31-1960-Rel.pdf
**body:**

3 - PIPELINE OPERATIONS - MAIN INSTALLATION CARD 8-31-1960 PLD25FR002 docket item 14. 2 pages. 0 photograph references. Published media type: Other. Metadata only; the linked docket file is not mirrored.
- **truncated:** false
- **body characters:** 203
