# MATERIAL LAB - 14-070 ---- FUSION WORK AT GEORG FISCHER CENTRAL PLASTICS FINAL

- **operation:** document
- **citation:** DCA14MP002 docket item 171
- **title:** MATERIAL LAB - 14-070 ---- FUSION WORK AT GEORG FISCHER CENTRAL PLASTICS FINAL
- **source type:** incident
- **agency:** National Transportation Safety Board
- **status:** current
- **official:** true
- **published on:** Not available
- **effective on:** Not available
- **summary:** DCA14MP002; docket item 171; Text/Image.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/ntsb-docket-item-1916364.json
- **markdown:** https://regulus.evalyn.ai/document/ntsb-docket-item-1916364.md
- **app url:** https://regulus.evalyn.ai/document/ntsb-docket-item-1916364
- **source url:** https://data.ntsb.gov/Docket/Document/docBLOB?ID=1916364&FileExtension=pdf&FileName=14-070%20----%20Fusion%20Work%20at%20Georg%20Fischer%20Central%20Plastics%20FINAL-Rel.pdf
**body:**

MATERIAL LAB - 14-070 ---- FUSION WORK AT GEORG FISCHER CENTRAL PLASTICS FINAL DCA14MP002 docket item 171. 29 pages. 0 photograph references. Published media type: Text/Image. Metadata only; the linked docket file is not mirrored.
- **truncated:** false
- **body characters:** 230
