# INTERVIEW WITH SENIOR FIELD CONSTRUCTION COORDINATOR - ATMOS

- **operation:** document
- **citation:** PLD25FR002 docket item 64
- **title:** INTERVIEW WITH SENIOR FIELD CONSTRUCTION COORDINATOR - ATMOS
- **source type:** incident
- **agency:** National Transportation Safety Board
- **status:** current
- **official:** true
- **published on:** Not available
- **effective on:** Not available
- **summary:** PLD25FR002; docket item 64; Text/Image.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/ntsb-docket-item-19192096.json
- **markdown:** https://regulus.evalyn.ai/document/ntsb-docket-item-19192096.md
- **app url:** https://regulus.evalyn.ai/document/ntsb-docket-item-19192096
- **source url:** https://data.ntsb.gov/Docket/Document/docBLOB?ID=19192096&FileExtension=pdf&FileName=PLD25FR002_Cook.12-04-24%20Combined_Redacted-Rel.pdf
**body:**

INTERVIEW WITH SENIOR FIELD CONSTRUCTION COORDINATOR - ATMOS PLD25FR002 docket item 64. 57 pages. 0 photograph references. Published media type: Text/Image. Metadata only; the linked docket file is not mirrored.
- **truncated:** false
- **body characters:** 211
