# 5 - INTEGRITY MANAGEMENT-UTAH DIVISION OF PUBLIC UTILITIES 11.5.2018 INSPECTION CORRESPONDENCE

- **operation:** document
- **citation:** PLD25FR001 docket item 32
- **title:** 5 - INTEGRITY MANAGEMENT-UTAH DIVISION OF PUBLIC UTILITIES 11.5.2018 INSPECTION CORRESPONDENCE
- **source type:** incident
- **agency:** National Transportation Safety Board
- **status:** current
- **official:** true
- **published on:** Not available
- **effective on:** Not available
- **summary:** PLD25FR001; docket item 32; Text/Image.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/ntsb-docket-item-19397818.json
- **markdown:** https://regulus.evalyn.ai/document/ntsb-docket-item-19397818.md
- **app url:** https://regulus.evalyn.ai/document/ntsb-docket-item-19397818
- **source url:** https://data.ntsb.gov/Docket/Document/docBLOB?ID=19397818&FileExtension=pdf&FileName=20181028AZ%20DEU%20DIMP%20Aldyl-A%20Letter%2011_5_18_Redacted-Rel.pdf
**body:**

5 - INTEGRITY MANAGEMENT-UTAH DIVISION OF PUBLIC UTILITIES 11.5.2018 INSPECTION CORRESPONDENCE PLD25FR001 docket item 32. 2 pages. 0 photograph references. Published media type: Text/Image. Metadata only; the linked docket file is not mirrored.
- **truncated:** false
- **body characters:** 244
