# 2-PIPELINE OPERATIONS-GAS LOSS CALCULATION PROVIDED BY ENBRIDGE GAS UTAH

- **operation:** document
- **citation:** PLD25FR001 docket item 12
- **title:** 2-PIPELINE OPERATIONS-GAS LOSS CALCULATION PROVIDED BY ENBRIDGE GAS UTAH
- **source type:** incident
- **agency:** National Transportation Safety Board
- **status:** current
- **official:** true
- **published on:** Not available
- **effective on:** Not available
- **summary:** PLD25FR001; docket item 12; Text/Image.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/ntsb-docket-item-19475531.json
- **markdown:** https://regulus.evalyn.ai/document/ntsb-docket-item-19475531.md
- **app url:** https://regulus.evalyn.ai/document/ntsb-docket-item-19475531
- **source url:** https://data.ntsb.gov/Docket/Document/docBLOB?ID=19475531&FileExtension=pdf&FileName=Gas%20Loss%20Calculation%20provided%20by%20Enbridge%20Gas%20Utah-Rel.pdf
**body:**

2-PIPELINE OPERATIONS-GAS LOSS CALCULATION PROVIDED BY ENBRIDGE GAS UTAH PLD25FR001 docket item 12. 1 page. 0 photograph references. Published media type: Text/Image. Metadata only; the linked docket file is not mirrored.
- **truncated:** false
- **body characters:** 221
