# 4 - INTEGRITY MANAGEMENT - REPAIRED BELOWGROUND LEAKS THAT WERE OPEN 1.24.2024 WITHIN 5-MILE RADIUS OF CAPITOL BUILDING

- **operation:** document
- **citation:** PLD24FR003 docket item 79
- **title:** 4 - INTEGRITY MANAGEMENT - REPAIRED BELOWGROUND LEAKS THAT WERE OPEN 1.24.2024 WITHIN 5-MILE RADIUS OF CAPITOL BUILDING
- **source type:** incident
- **agency:** National Transportation Safety Board
- **status:** current
- **official:** true
- **published on:** Not available
- **effective on:** Not available
- **summary:** PLD24FR003; docket item 79; Text/Image.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/ntsb-docket-item-19721177.json
- **markdown:** https://regulus.evalyn.ai/document/ntsb-docket-item-19721177.md
- **app url:** https://regulus.evalyn.ai/document/ntsb-docket-item-19721177
- **source url:** https://data.ntsb.gov/Docket/Document/docBLOB?ID=19721177&FileExtension=pdf&FileName=Repaired%20Belowground%20Leaks%20That%20Were%20Open%201.24.2024%20Within%205-mile%20Radius%20of%20Capitol%20Building-Rel.pdf
**body:**

4 - INTEGRITY MANAGEMENT - REPAIRED BELOWGROUND LEAKS THAT WERE OPEN 1.24.2024 WITHIN 5-MILE RADIUS OF CAPITOL BUILDING PLD24FR003 docket item 79. 2 pages. 0 photograph references. Published media type: Text/Image. Metadata only; the linked docket file is not mirrored.
- **truncated:** false
- **body characters:** 269
