# 2 - PIPELINE OPERATIONS - CONSTRUCTION PROCEDURES (MECHANICAL FITTING REPLACEMENTS)

- **operation:** document
- **citation:** PLD24FR003 docket item 65
- **title:** 2 - PIPELINE OPERATIONS - CONSTRUCTION PROCEDURES (MECHANICAL FITTING REPLACEMENTS)
- **source type:** incident
- **agency:** National Transportation Safety Board
- **status:** current
- **official:** true
- **published on:** Not available
- **effective on:** Not available
- **summary:** PLD24FR003; docket item 65; Text/Image.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/ntsb-docket-item-19728005.json
- **markdown:** https://regulus.evalyn.ai/document/ntsb-docket-item-19728005.md
- **app url:** https://regulus.evalyn.ai/document/ntsb-docket-item-19728005
- **source url:** https://data.ntsb.gov/Docket/Document/docBLOB?ID=19728005&FileExtension=pdf&FileName=JXN-NTSB-002970-2973%20(Construction%20Procedures%20(couplings))-Rel.pdf
**body:**

2 - PIPELINE OPERATIONS - CONSTRUCTION PROCEDURES (MECHANICAL FITTING REPLACEMENTS) PLD24FR003 docket item 65. 3 pages. 0 photograph references. Published media type: Text/Image. Metadata only; the linked docket file is not mirrored.
- **truncated:** false
- **body characters:** 233
