# 3 - PIPELINE OPERATIONS - ATMOS VALVE BOX INSTALLATION DRAWING, CURRENT

- **operation:** document
- **citation:** PLD25FR002 docket item 43
- **title:** 3 - PIPELINE OPERATIONS - ATMOS VALVE BOX INSTALLATION DRAWING, CURRENT
- **source type:** incident
- **agency:** National Transportation Safety Board
- **status:** current
- **official:** true
- **published on:** Not available
- **effective on:** Not available
- **summary:** PLD25FR002; docket item 43; Text/Image.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/ntsb-docket-item-20219107.json
- **markdown:** https://regulus.evalyn.ai/document/ntsb-docket-item-20219107.md
- **app url:** https://regulus.evalyn.ai/document/ntsb-docket-item-20219107
- **source url:** https://data.ntsb.gov/Docket/Document/docBLOB?ID=20219107&FileExtension=pdf&FileName=Atmos%20Current%20Valve%20Box%20Installation%20Drawing%2010-003-03_Redacted-Rel.pdf
**body:**

3 - PIPELINE OPERATIONS - ATMOS VALVE BOX INSTALLATION DRAWING, CURRENT PLD25FR002 docket item 43. 1 page. 0 photograph references. Published media type: Text/Image. Metadata only; the linked docket file is not mirrored.
- **truncated:** false
- **body characters:** 220
