# Cleburne C&H Power Line Procedure Changes

- **operation:** document
- **citation:** DCA10FP004 docket item 63
- **title:** Cleburne C&H Power Line Procedure Changes
- **source type:** incident
- **agency:** National Transportation Safety Board
- **status:** current
- **official:** true
- **published on:** Not available
- **effective on:** Not available
- **summary:** DCA10FP004; docket item 63; Adobe PDF file.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/ntsb-docket-item-40352512.json
- **markdown:** https://regulus.evalyn.ai/document/ntsb-docket-item-40352512.md
- **app url:** https://regulus.evalyn.ai/document/ntsb-docket-item-40352512
- **source url:** https://data.ntsb.gov/Docket/Document/docBLOB?ID=40352512&FileExtension=.PDF&FileName=Cleburne%20C%26H%20Power%20Line%20Procedure%20Changes-Redacted.PDF
**body:**

Cleburne C&H Power Line Procedure Changes DCA10FP004 docket item 63. 2 pages. 0 photograph references. Published media type: Adobe PDF file. Metadata only; the linked docket file is not mirrored.
- **truncated:** false
- **body characters:** 195
