# Control Room and SCADA Operation Attachment 29 - Marshall Station PLC Pump Shutdown

- **operation:** document
- **citation:** DCA10MP007 docket item 158
- **title:** Control Room and SCADA Operation Attachment 29 - Marshall Station PLC Pump Shutdown
- **source type:** incident
- **agency:** National Transportation Safety Board
- **status:** current
- **official:** true
- **published on:** Not available
- **effective on:** Not available
- **summary:** DCA10MP007; docket item 158; Adobe PDF file.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/ntsb-docket-item-40363567.json
- **markdown:** https://regulus.evalyn.ai/document/ntsb-docket-item-40363567.md
- **app url:** https://regulus.evalyn.ai/document/ntsb-docket-item-40363567
- **source url:** https://data.ntsb.gov/Docket/Document/docBLOB?ID=40363567&FileExtension=.PDF&FileName=Control%20Room%20and%20SCADA%20Operation%20Attachment%2029%20-%20Marshall%20Station%20PLC%20Pump%20Shutdown-Master.PDF
**body:**

Control Room and SCADA Operation Attachment 29 - Marshall Station PLC Pump Shutdown DCA10MP007 docket item 158. 1 page. 0 photograph references. Published media type: Adobe PDF file. Metadata only; the linked docket file is not mirrored.
- **truncated:** false
- **body characters:** 237
